My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2007 - 2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
2500
>
2300 - Underground Storage Tank Program
>
PR0232507
>
COMPLIANCE INFO 2007 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2023 12:00:24 PM
Creation date
11/8/2018 9:56:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007 - 2015
RECORD_ID
PR0232507
PE
2361
FACILITY_ID
FA0003846
FACILITY_NAME
Verizon Business: LDIKCA
STREET_NUMBER
2500
Direction
W
STREET_NAME
TURNER
STREET_TYPE
Rd
City
Lodi
Zip
95242
APN
029-030-39
CURRENT_STATUS
01
SITE_LOCATION
2500 W Turner Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\T\TURNER\2500\PR0232507\COMPLIANCE INFO 2007 - 2015.pdf
QuestysFileName
COMPLIANCE INFO 2007 - 2015
QuestysRecordDate
9/9/2016 5:33:19 PM
QuestysRecordID
3186119
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
362
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'4w' .r <br /> UNDERGROUND STORAGE TANK RESPONSE PLAN <br /> For use by Unidacs Member Agencies or where approved by your Local Jurisdiction <br /> Authority Cited: Title 23 CCR, Sections 2632(d)(2),2634(e),and 2641(h) <br /> Onc form per facility) <br /> TYPE OF ACTION © 1.NEW PLAN 2.CHANGE OF INFORMATION x01. <br /> I. FACILITY INFORMATION <br /> �ryry <br /> FACILITY ID#R (Agency Use Only) <br /> FACILITY NAME <br /> {�,�` ` <br /> � <br /> FACILITY SITE ADDRESS ! R03. CITY Rao <br /> II. SPILL CONW A1Vb 6LEANUP MET H0_DS <br /> '[Itis plan addresses unauthorized releases fromUsystems and supplements the emergency response plans and procedures in the facility's Hazardous hfater�als <br /> Business Plan. <br /> ➢ If safe to do so,facility personnel will take immediate measures to control or stop any release(e.g.,activate pump shut-off,etc.)and,if necessary,safely remove <br /> remaining hazardous material from the UST system. <br /> Any release to secondary containment will be pumped or otherwise removed within a time consistent with the ability of the secondary containment system to <br /> contain the hazardous material,but not greater than 30 calendar days,or sooner if required by the local agency. Recovered hazardous materials,unless still suitable <br /> for their intended use,will be managed as hazardous waste. <br /> ➢ Absorbent material will be used to contain and clean up manageable spills of hazardous materials. Absorbent material may be reused until it becomes too saturated <br /> to be effective. It will then be managed properly.Used absorbent material,reusable or waste,will be stored in a properly labeled and jQ M1d container. <br /> ➢ Facility personnel will determine whether or not any water removed from secondary containment systems,or from clean-up activity,has been in contact with any <br /> hazardous material. If the water is contaminated, it will be managed as hazardous waste. If the water has a petroleum sheen (i.c., rainbow colors), it is <br /> contaminated. A thick floating petroleum layer may not necessarily display rainbow colors. Water(hazardous or non-hazardous)from sumps,spill containers,etc, <br /> will not be disposed to storm water systems. <br /> D We will review secondary containment systems for possible deterioration if any of the following conditions occur: <br /> I. Hazardous material in contact with secondary containment is not compatible with the material used for secondary containment; <br /> 2. Secondary containment is prone to damage from any equipment used to remove or clean up hazardous material collected in secondary containment; <br /> 3. Hazardous material, other than the product/waste stored in the primary containment system, is placed inside secondary containment to treat or neutralize <br /> released product waste,and the added material or resulting material from such a combination is not compatible with secondary containment, <br /> 111. SPILL CONTROL AND CLEAN-UP EQUIPMENT <br /> equipment s insOFIC peccteed at least monthly,and after each use,and supplies areP replenishedasneeded.is <br /> eequipmelnt`issrepaaired(or replaced e <br /> Spill p equipment p p Y s Busmcs; Plan, T!1L9 <br /> ui <br /> as necessary. <br /> EQUIPMENT NOT PERMANENTLY ON-STYE BUT AVAILABLE FOR USE IF NEEDED: (Complete only ifs licable <br /> EQUIPMENT LOCATION I AVAILABILITY <br /> R10. R2o. <br /> R30. <br /> RI t. R21. <br /> R31. <br /> R12. )122 <br /> R32. <br /> R13. R23. <br /> A33, <br /> R14. 1124 <br /> R34_ <br /> R15, R25. Rai <br /> IV. RESPONSIBLE PERSO]V S <br /> THE FOLLOWING PERSON(S)IS/ARESPONSIBLE FOR AUTHORI .N <br /> ZING ANA'WORK EC T'SS;U2A'I?ND NOIR <br /> TMS n!' l:ro `,ISE PI # <br /> NAME Roo. TITLE Rso. <br /> �" 1 1 (� ,.I �xkie ��nti <J <br /> NAME d Rat. TITLE Rsl.Grp , �,� <br /> NAME Rae. TITLE sss. <br /> NAME R41 TITLE ,123. <br /> V. INDIRECT HAZARD DETER_MINA,rION <br /> This information is required only when the presence of the hazardous substance can not he determined dirct 0.N by the monitoring method used(o,g,�11crc liquid I"Cl <br /> measurements in a tank annular space or secondary piping are used as the basis for leak dcicran nation). <br /> THE FOLLOWING STEPS WILL BE TAKEN TO DETERMINE THE PRESENCE OR ABSENCE OF HAZARDOUS SUBSTANCE IN THE SECONDARY <br /> CONTAINMENT IF MONITORING INDICATES A POSSIBLE UNAUTHORIZED RELEASE: <br /> R6➢. <br /> UN-022B-113 www.unidoes.org Rev.10/14103 <br />
The URL can be used to link to this page
Your browser does not support the video tag.