My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2007 - 2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
2500
>
2300 - Underground Storage Tank Program
>
PR0232507
>
COMPLIANCE INFO 2007 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2023 12:00:24 PM
Creation date
11/8/2018 9:56:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007 - 2015
RECORD_ID
PR0232507
PE
2361
FACILITY_ID
FA0003846
FACILITY_NAME
Verizon Business: LDIKCA
STREET_NUMBER
2500
Direction
W
STREET_NAME
TURNER
STREET_TYPE
Rd
City
Lodi
Zip
95242
APN
029-030-39
CURRENT_STATUS
01
SITE_LOCATION
2500 W Turner Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\T\TURNER\2500\PR0232507\COMPLIANCE INFO 2007 - 2015.pdf
QuestysFileName
COMPLIANCE INFO 2007 - 2015
QuestysRecordDate
9/9/2016 5:33:19 PM
QuestysRecordID
3186119
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
362
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
%N.W SAN JOAQUIN COUNTY Iwo, <br /> ENVIRONMENTAL HEALTH DEPARTMENT <br /> 600 East Main Street, Stockton, California 95202-3029 <br /> Telephone:(209) 468-3420 Fax:(209) 468-3433 Web:www.sigov.org/ehd/unitiii.html <br /> UNDERGROUND STORAGE TANK (UST) PROGRAM INSPECTION REPORT CONTINUED <br /> Facility n ` Facility '[' (� Inspection <br /> Name: eR�� � � �T '��J Address: �S� 1��'1 L { Date: ` L <br /> VIOLATIONS <br /> # C1 C2 M Code Section HSC=CA Health and Safety Code;CFR=Code of Federal Regulations <br /> C1 =Class 1 violation,C2=Class 2 violation;M=Minor violation <br /> On Site Records(continued) <br /> 204 CCR 2715(c) Designated operator monthly inspection: (1)alarms not documented;(2-4)spill containers,UDCs,and sumps <br /> if necessary)not inspected; 5 required test dates not checked or noted; fi employee training not verified <br /> 205 CCR 2715(e) Designated operator monthly inspection reports not maintained on site for at least 12 months <br /> 206 CCR 2715(f) Designated operator employee training: (1)not performed;(2)not current for at least one employee on site; <br /> 3 log not kept <br /> 207 HSC 25261.5(b)(2) Unburied fuel piping at marinas not visually inspected at least daily or log not kept <br /> sObservations _ <br /> 301 HSC 25292.1 UST system is not operated to prevent unauthorized release,including spills and overfills <br /> 302 HSC 25291(b) UST monitoring system incapable of detecting leak from primary containment into secondary containment(M1) <br /> 303 CCR 2630(d) UST monitoring equipment is not installed or maintained to detect a leak at the earliest opportunity (Mt) <br /> 304 CCR 2632(c)(2) Monitoring system is not present in the interstitial space of a double walled UST (M1) <br /> 305 CCR 2636(f)(1) Failed to maintain a continuous monitoring system for underground piping&UDCs that activates an (Mi) <br /> audible and visual alarm or stops flow of product at the dispenser when it detects a leak <br /> 306 CCR 2631(a) Primary containment is not product tight <br /> 307 HSC 25291(a)(2) Secondary containment for UST system is not tight <br /> 308 CCR 2636(c)(1) All releases in secondary piping do not flow to a collection sump <br /> 309 CCR 2636(a) Failed to have secondary containment for piping(includes conventional suction piping) {M2) <br /> 310 HSC 25291(9) Water in 21 containment not removed,analyzed&proper!y disposed of <br /> 311 CCR 2636(f)(2) Line leak detector(s)not installed or failed to detect a 3-gallon per hour leak at 10 psi (M1) <br /> 312 CCR 2635(b) No spill container or overfill prevention system installed (M2) <br /> 313 CCR 2635(b)(1) Spill container failed to contain a minimum capacity of five gallons,or failed to provide a means to keep (M2) <br /> the spill container empty <br /> 314 CCR 2635(b)(2) Overfill prevention system was overridden or failed to meet overfill requirements (M2) <br /> 315 HSC 25299(f)(2) Tampering with or disabling leak detection devices or alarms <br /> 316 CCR 2631.1(a) UST system is not compatible with the substance stored <br /> 317 HSC 25298(a) Illegally abandoned UST system <br /> AB 1702(2003-2004) HSC 25290.1 (installed between 07/01/03 and 06130104) <br /> VPH Systems HSC 25290.1 installed on or after 07/01/04 <br /> Compatibility and permeability requirements:(a)UST system is not compatible with the substance stored;(b) <br /> 401 CCR 2631.1 results of the compatibility and permeability testing requirements listed in subsections CCR 2631(b)and(d) <br /> for a UST system installed after July 1,2004,were not submitted <br /> 402 HSC 25290.1(c)(1) Primary containment not liquid or vapor tight <br /> HSC 25290.2(c)(1) <br /> 403 HSC 25290.1(c)(2) Secondary containment not liquid or vapor tight <br /> HSC 25290.2(c)(2) <br /> 404 HSC 25290.1(c)(3) Secondary containment not constructed to prevent water intrusion <br /> HSC 25290.2(c)(3) <br /> 405 HSC 25290.1(d) Monitoring system not maintained to detect water intrusion into the secondary containment,or the entry of <br /> HSC 25290.2(d) liquid or vapor from the primary containment into the secondary containment <br /> 406 HSG 25290.1(e) Interstitial liquid measurement method,constant vacuum,or constant pressure in the interstitial space of the <br /> UST s stem not maintained <br /> 407 HSC 25290.10) UST system not tested by one of the following methods prior to use:(1) Enhanced leak detection;(2)inert gas <br /> HSC 25290.2.0) pressure test approved by SWRCB; 3 test method deemed equivalent to 1 or 2 by the SWRCB <br /> Emergency Generator Systems <br /> 501 CCR 2636(f)(6) Emergency generator monitoring system not checked daily or log not kept if no leak detector (M1) <br /> 502 HSC 25281.5(b)(3) Unburied fuel piping not visually inspected at least monthly or log not kept (M1) <br /> USTs in a Vault <br /> 609 HSC 25283.5(a)(1) All exterior surfaces of the tank and connected piping cannot be directiy viewed <br /> 602 HSG 25283.5(a)(2) Structure that the UST is located in does not provide for secondary containment <br /> 603 HSC 25283.5(x)(3) Failed to conduct weekly UST inspections or maintain a log of weekly inspections <br /> 604 HSC 25283.5(a)(5) UST installed after July 1,2003,does not meet or exceed applicable sections of HSC 25291 <br /> Non-Pressurized Piping <br /> 701 CCR 2643(d) Daily monitoring of s tion piping n January 1, 1984)not performed {M1) <br /> inspector. Receiv d B Title: <br /> t <br /> t <br /> EHD 23-02 Rev 911!11 Page 2 UST INSPECTIO EPORT <br />
The URL can be used to link to this page
Your browser does not support the video tag.