My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2007 - 2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
2500
>
2300 - Underground Storage Tank Program
>
PR0232507
>
COMPLIANCE INFO 2007 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2023 12:00:24 PM
Creation date
11/8/2018 9:56:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007 - 2015
RECORD_ID
PR0232507
PE
2361
FACILITY_ID
FA0003846
FACILITY_NAME
Verizon Business: LDIKCA
STREET_NUMBER
2500
Direction
W
STREET_NAME
TURNER
STREET_TYPE
Rd
City
Lodi
Zip
95242
APN
029-030-39
CURRENT_STATUS
01
SITE_LOCATION
2500 W Turner Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\T\TURNER\2500\PR0232507\COMPLIANCE INFO 2007 - 2015.pdf
QuestysFileName
COMPLIANCE INFO 2007 - 2015
QuestysRecordDate
9/9/2016 5:33:19 PM
QuestysRecordID
3186119
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
362
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
N ..e <br /> Verizon Business <br /> 2500 W. Turner Rd. <br /> Lodi, CA 95242 <br /> Annual Under Ground Storage Tank Training for Facilities Employees <br /> The following employees were trained by the Designated Operator Robert Guldseth <br /> Cal/ ICC# 5300054-UC on 6114107. <br /> Rod Crisostomo—209- 367 - 2605 <br /> Leonard Freitas—209—367 - 2628 <br /> Charles Morris - 209—367--2665 <br /> The following procedures and best management practices were covered both at round <br /> table meeting and in the field. <br /> 1) We traced the entire systems and each significant component and its functions in <br /> regards to the monitoring controls. <br /> 2) The monitor operations and the specific alarms were discussed. <br /> 3) The site plan in conjunction with the Spill Prevention and Counter measurement <br /> Control Plans was discussed with a readiness action diagram. <br /> 4) The location of the emergency contact lists were reviewed and discussed, along <br /> with the responsibilities of the facilities first responders. <br /> The UST system introduction and review was very informative and will be reviewed <br /> every year at the Monitor Inspection due date. <br /> Regards, <br /> Verizon Business <br /> Facilities Technical Operations <br /> Robert Guldseth <br /> 916-549-4942 <br />
The URL can be used to link to this page
Your browser does not support the video tag.