Laserfiche WebLink
4W. 'WW <br /> SWRCB,January 2002 Page_of <br /> • 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested <br /> Test Method Developed By: Spill Bucket Manufacturer IrIndustry Standard Professional Engineer <br /> 1 Other(Specify) <br /> Test Method Used: E Pressure Vacuum Hydrostatic <br /> Cc,« .JC l,r F1 Other(Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> Spill Box# Spill Box# Spill Box # Spill Box# <br /> Bucket Diameter: I Z ,r <br /> Bucket Depth: 1 2 <br /> Wait time between applying <br /> pressure/vacuum/water and !Qr°t <br /> startin test: <br /> Test Start Time: 1130 <br /> Initial Reading(RI): (l ie <br /> Test End Time: 160 <br /> Final Reading(RF): if ' <br /> Test Duration: 26 OA,,n <br /> Change in Reading(RF-R,): 4( — <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test Result: Pass r,Fail Pass L Fail E Pass D Fail ❑ Pass p F>a <br /> Comments--(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />