Laserfiche WebLink
UNDERGROUND STORAGE TANK MONITORING PLAN <br /> For use by Unidocs Member Agencies or where approved by your Local Jurisdiction <br /> OZ Authority Cited: Title 23 CCR,Sections 2632(d)(1),2634(d)(2),and 2641(h) <br /> VP7LAN <br /> E OF ACTION 1.NEW PLAN ❑ 2.CHANGE OF INFORMATION Moa. <br /> TYPE MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. Moz <br /> eck one item only) ❑ THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> FACILITY ID#(Agency Use Only) <br /> FACILITY NAME m L-I- <br /> Nto3. <br /> FACILITY SITE ADDRESS ^Sv W- fi�f fit M04 CITY <br /> �� �; MOS, <br /> .. UIPM_ENT TESTING ANDnEVENT <br /> requires that testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,p probes,line detectors, <br /> State law eteclors etc.)be performed in M06 <br /> accordance with the equipment manufacturers'instructions,or annually,whichever is more frequent. Such work must be performed by qualified personnel. <br /> MONITORING EQUIPMENT IS SERVICED ANNUALLY ❑ 919.OTHER,(Specify): Mol. <br /> Ill. MONITORING LOCATIONS is <br /> This monitoring plan must include a Site Pian showing the general tank and piping layouts and the locations where monitoring is performed(i.e.,location of each sensor, <br /> line leak detector,monitoring system control panel,etc.). If you already have a diagram(e.g.,current UST Monitoring Site Plan from a Monitoring S}'stem Certification <br /> form,Hazardous Materials Business Plan map,etc. which shows all required information include it with this plan. <br /> IV.. fiA"N 'MUNIT0PdNG <br /> VTORING IS PERFORMED USING THE FOLLOWING METHOD(S)_(Check all that apply) Mia. <br /> CONTINUOUS ELECTRONIC MONITORIN�G O TANK LAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONT INMENT VAULT(S) <br /> SECONDARY CONTAINMENT IS: [To.DRY b.LIQUID FILLED ❑ c.UNDER PRESSURE <br /> PANEL MANUFACTURER: E R, W M12 MODEL#: A 111/S k f IC �%S ID MM <br /> LEAK SENSOR MANUFACTURER: IE(S�..1 Mia. MODEL#(S): _ L S --I A Mts- <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK S <br /> PANEL MANUFACTURER: Mr6. MODEL#: MIT <br /> IN-TANK PROBE MANUFACTURER: Mrd MODEL#(S): M19 <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILYMIGHTLY ❑ c.WEEKLY M20 <br /> El d.MONTHLY ❑ e.OTHER(Specify): Mel <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.h. ❑ b.0.2 g.p.h, ❑ c.OTHER(Specify): M22. M23 <br /> ❑ 3.INVENTORY RECONCILIATION ❑ a.MANUAL PER 23 CCA§2646 ❑ b.STATISTICAL PER 23 CCR§2646.1 ta324 <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)PER 23 CCR§2645 <br /> TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS M25. <br /> ❑ 5.INTEGRITY TESTING PER 23 CCR§2643.1 <br /> �� TEST FREQUENCY: I-] a.,ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): M26. Mei <br /> L7 6.VISUAL MONITORING DONE: Er7a.DAILY ❑ b.WEEKLY(Requires ase gappmva) <br /> ❑ 99.OTHER(Specify): <br /> M2s. <br /> V. PIPEMONITORING <br /> MOIL TORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) M3o- <br /> l.CONTINUOUS ELECTRONIC MONITORING PIPING MP(S)/TRENCH(ES)AND OTHER SECONDARY CONTAINMENT <br /> SECONDARY CONTAINMENT IS: a.DRY04rO b.LIQUID FILLED Elc.UNDER PRESSURE a - M Mai, <br /> PANEL MANUFACTURER: E w M32 MODEL C /l`'�'-1 Sf:IC a O M33, <br /> LEAK SENSOR MANUFACTURER: _ �� M34. MODEL#(S): _'i M35. <br /> WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN? ❑ a.YES ❑ b.NO M36- <br /> WILL FAILURF/DISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO MJ7 <br /> ❑ 2.MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED <br /> MLLD s MANUFACTURER : M3s. <br /> ( ) MODEL#(S): M3v. <br /> © 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS <br /> ELLD MANUFACTURER: Moa. MODEL#: Mat. <br /> PROGRAMMED LINE INTEGRITY TESTS: ❑ a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1 g.p.h. M42. <br /> WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO M43. <br /> WILL ELLD FAILUREJDISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO M44. <br /> 4.INTEGRITY TESTING <br /> TEST FREQUENCY: �❑ ANNUALLY b.EVERY 3 YEARS ❑ c.OTHER(Specify) Mas. M46, <br /> VISUAL MONITORING DONE: 10 a.DAILY ❑ b.WEEKLY* <br /> M47. <br /> `Requires agency appmva ••Arlowcd for menitwing of unburied emergency generator fuel piping onh per HSC§252ai.5(bx3) <br /> ❑ 6.PIPING IS SUCTION PIPING MEETING ALL REQUIREMENTS FOR EXEMPTION FROM MONITORING PER 23 CCR§2636(ax3) <br /> ❑ 7.NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) <br /> ❑ 99.OTHER(Specify) <br /> nfas, <br /> UN-022A-115 www.unidocs.org Rev.10/14/03 <br />