My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2007 - 2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
2500
>
2300 - Underground Storage Tank Program
>
PR0232507
>
COMPLIANCE INFO 2007 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2023 12:00:24 PM
Creation date
11/8/2018 9:56:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007 - 2015
RECORD_ID
PR0232507
PE
2361
FACILITY_ID
FA0003846
FACILITY_NAME
Verizon Business: LDIKCA
STREET_NUMBER
2500
Direction
W
STREET_NAME
TURNER
STREET_TYPE
Rd
City
Lodi
Zip
95242
APN
029-030-39
CURRENT_STATUS
01
SITE_LOCATION
2500 W Turner Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\T\TURNER\2500\PR0232507\COMPLIANCE INFO 2007 - 2015.pdf
QuestysFileName
COMPLIANCE INFO 2007 - 2015
QuestysRecordDate
9/9/2016 5:33:19 PM
QuestysRecordID
3186119
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
362
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� 4 <br /> UNDERGROUND STORAGE TANK RESPONSE PLAN <br /> For use by Unidocs Member Agencies or where approved by your Local Jurisdiction <br /> Authority Cited., Title 23 CCR, Sections 2632(d)(2), 2634(e), and 2641(h) <br /> One form r facility) <br /> TYPE OF ACTION W1.NEW PLAN Cl 2.CHANGE OF INFORMATION ROI. <br /> FACILITY ID 4 (Agency Use Only) � INNEW <br /> FACILITY NAME <br /> R02 <br /> FACILITY SITE ADDRESS RQ3 CITY Roo. <br /> This plan addresses unauthorized releases from UST systems and supplements the emergency response plans and prutxdttrss in the facility s Hazardous Materials <br /> Business Plan <br /> ➢ If safe to do so,facility personnel will take immediate measures to control or stop any release(e.g.,activate pump shut-off,etc.)and,if necessary,safely remove <br /> remaining hazardous material from the UST system. <br /> ➢ Any release to secondary containment will be pumped or otherwise removed within a time consistent with the ability of the secondary containment system to <br /> contain the hazardous material,but not greater than 30 calendar days,or sooner if required by the local agency. Recovered hazardous materials,unless still suitable <br /> for their intended use,will be managed as hazardous waste, <br /> D Absorbent material will be used to contain and clean up manageable spills of hazardous materials. Absorbent material may be reused until it becomes too saturated <br /> to be effective, It will then be managed properly.Used absorbent material,reusable or waste,will be stored in a properly labeled and sealed container. <br /> ➢ Facility personnel will determine whether or not any water removed from secondary containment systems,or from clean-up activity,has been in contact with any <br /> hazardous material. If the water is contaminated, it will be managed as hazardous waste. .if the water has a petroleum sheen (i.e., rainbow colors), <br /> it is <br /> contaminated. A thick floating petroleum layer may not necessarily display rainbow colors. Water(hazardous or non-hazardous)tram sumps,spill containers etc. <br /> will not be disposed to storm water systems. <br /> D We will review secondary containment systems for possible deterioration if any ofthe following conditions occur: <br /> 1. Hazardous material in contact with secondary containment is not compatible with the material used for secondary containment; <br /> 2. Secondary containment is prone to damage from any equipment used to remove or clean up hazardous material collected in secondary containment <br /> 3. Hazardous material, other than the product/waste stored in the primary containment systern, is placed inside secondary containment to treat or neutralize <br /> released producUwaste,and the added material or resulting material from such a combination is not compatible with secondary containment. <br /> PERIODIC 11EAIN'I'ENANCE: Spill control and clean-up equipment kept permanently on is listed in the facility's Hazardous Materials Business Plan. This <br /> equipment is inspected at least monthly,and after each use,and supplies are replenished as needed. Defective equipment is repaired or replaced as necessary. <br /> EQUIPMENT NOT PERMANENTLY ON-SITE BUT AVAILABLE FOR USE IF NEEDED: nly if applicable) <br /> EQUIPMENT LOCATION AVAILABILITY <br /> R10. R20. R30_ <br /> R,1. <br /> R21. R31. <br /> RI2_ R22. <br /> R-12 <br /> R13. R23. <br /> R33. <br /> RI4. R24. RA <br /> R15, R25. <br /> R35_ <br /> IV I2I.�i <br /> THE FOLLOWING PERSON(S)ISIARE RESPONSIBLE FOR AU'711 ORIZING ANY WORK NECESSARY UNDER THIS RESPONSE PLAN: <br /> NAME YVNl ]� Roo. TITLE <br /> +��1 R50 <br /> rrIN(A,\., ,>r <br /> NAME R41. TrrLE M1 <br /> NAME <br /> ©;.�.o SkNFF 5Si- <br /> NAME R42 TITLE R52. <br /> NAME R43. TITLE tts3. <br /> N'. INDIRECT IIAZARI) I)F;TL+RNIINATION <br /> This information is required o�y when the presence of the hazardous substance can n(t I, dctcrmmed directly h. the Inon3tcir ink�l�etllod used{ where liquid level <br /> measurements in a tank annular space or secondary piping are used as the basis for leak determination), <br /> THE FOLLOWING STEPS WILL BE TAKEN TO DETERMINE THE PRESENCE OR ABSENCE OF HAZARDOUS SUBSTANCE IN THE SECONDARY <br /> CONTAINMENT IF MONITORING INDICATES A POSSIBLE UNAUTHORIZED RELEASE: <br /> R6D. <br /> UN-022B-If3 www.unidocs.org <br /> Rev.10/14/03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.