My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VALPICO
>
550
>
2300 - Underground Storage Tank Program
>
PR0536555
>
INSTALL_2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2019 3:22:40 PM
Creation date
11/8/2018 9:57:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2012
RECORD_ID
PR0536555
PE
2351
FACILITY_ID
FA0020989
FACILITY_NAME
Arco. Am pm 83333
STREET_NUMBER
550
Direction
W
STREET_NAME
VALPICO
STREET_TYPE
Rd
City
Tracy
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
550 W Valpico Rd
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\V\VALPICO\550\PR0536555\INSTALL PLAN 2012.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Vacuum Senor Kits are available in three models: one for monitoring double-walled <br /> piping and sump interstices, one for monitoring double-walled steel tank interstices (see <br /> example installation drawing in section 4.0 of this MSR) and one for double-walled <br /> fiberglass tanks. These kits differ in the number of vacuum sensors and configuration <br /> of associated liquid sensors. An inline mounted liquid sensor is used for Vacuum <br /> Sensors monitoring piping and sumps. An appropriate tank liquid sensor (to be <br /> installed in the secondary space at the bottom of the tank) is provided with one of the <br /> Vacuum Sensors in the steel and fiberglass tank kits to monitor the tank interstice. <br /> The 3rd Party Certification is attached. UL approved, National Work Group and LG113 <br /> listed. <br /> 3.0 Launch Schedule <br /> As of the date of this MSR, the Vacuum Sensing System will be available for shipment. <br /> Due to order backlog, normal shipping lead times may not begin until late 2004. <br /> MSR 09-04-A 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.