My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VALPICO
>
550
>
2300 - Underground Storage Tank Program
>
PR0536555
>
INSTALL_2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2019 3:22:40 PM
Creation date
11/8/2018 9:57:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2012
RECORD_ID
PR0536555
PE
2351
FACILITY_ID
FA0020989
FACILITY_NAME
Arco. Am pm 83333
STREET_NUMBER
550
Direction
W
STREET_NAME
VALPICO
STREET_TYPE
Rd
City
Tracy
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
550 W Valpico Rd
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\V\VALPICO\550\PR0536555\INSTALL PLAN 2012.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
XERXES INSTALLATION MANUAL AND OPERATING GUIDELINES <br /> TABLE OF CONTENTS <br /> SECTIONS <br /> 1. Introduction 9. Geotextile Fabric <br /> 1.1. Safety........................................................................1 9.1. General......................................................................18 <br /> 1.2. General......................................................................1 10. Bottom Sumps and Fittings <br /> 1.3. Equipment.................................................................2 10.1. General......................................................................18 <br /> 2. Handling and Storing Tanks 11. Taking Diameter Measurements <br /> 2.1. General..........................................................................2 11.1. General......................................................................18 <br /> 2.2. Unloading and Hoisting Tanks....................................2 11.2. Diameter Measurement without a Standpipe........19 <br /> 2.3. Storing Tanks................................................................3 11.3. Diameter Measurement with a Standpipe..............19 <br /> 3. Preinstallation Inspection and Testing 11.4. Calculation and Comparison...................................19 <br /> 3.1. General..........................................................................3 12. Ballasting Tanks(Adding Liquid) <br /> 3.2. Inspecting the Tank......................................................4 12.1. General......................................................................19 <br /> 3.3. Pretesting Procedures..................................................4 13. Postinstallation Testing <br /> 3.4. Preparing the Tank for Air Testing...............................4 13.1. General......................................................................20 <br /> 3.5. Pressurizing the Primary Tank.....................................5 13.2. Air Testing Tanks.......................................................20 <br /> 3.6. Pressurizing the Interstitial Space 13.3. Optional Hydrostatic Testing...................................20 <br /> Ina Dry Tank.................................................................5 14. Piping and Venting <br /> 3.7. Soaping the Tank..........................................................5 14.1. Internal Piping...........................................................20 <br /> 3.8. Performing Visual Checks on a Tank 14.2. External Piping..........................................................21 <br /> with a Wet Interstitial Space........................................6 14.3. Venting Tanks............................................................21 <br /> 3.9. Releasing Pressure from the Tank...............................6 14.4. Venting Interstitial Spaces.......................................22 <br /> 4. Preinstallation Testing For Specific Types of 15. Monitoring Tanks <br /> Air-Testable Tanks 15.1. General......................................................................22 <br /> 4.1. Air Testing a Single-Wall Tank...................................6 15.2. Single-Wall Tank.......................................................22 <br /> 4.2. Testing a Wet Double-Wall Tank................................6 15.3. Double-Wall Tank.....................................................22 <br /> 4.3. Testing a Dry-Monitor, Double-Wall Tank with the 16. Installing Containment Sumps <br /> Interstitial Space Under Vacuum...................................7 16.1. General......................................................................23 <br /> 4.4. Air Testing a Dry-Monitor,Double-Wall Tank.............7 16.2. Final Containment Sump Installation......................24 <br /> 4.5. Air Testing a Dry-Monitor,Double-Wall 17. Adding Tanks at Existing Locations <br /> Muhicompartment Tank Not Under Vacuum.............7 17.1. General......................................................................24 <br /> 5. Installing Tanks 17.2. Preferred Method.....................................................24 <br /> 5.1. General..........................................................................8 17.3. Alternate Method......................................................25 <br /> 5.2. Dry-Hole Installation.....................................................8 18. Operating Guidelines <br /> 5.3. Wet-Hole Installation..................................................10 18.1. General......................................................................25 <br /> 6. Backfill Material 18.2. Temperature Limits for Stored Products <br /> 6.1. General........................................................................10 and Materials.........................................................25 <br /> 6.2. Primary Backfill...........................................................10 18.3. Entering Tanks..........................................................25 <br /> 6.3. Secondary Backfill......................................................11 18.4. Filling Tanks(in General)..........................................25 <br /> 7. Excavation Requirements 18.5. Filling UL-Labeled Tanks.........................................26 <br /> 7.1. General....................................................................11 19. Limited Warranties <br /> 7.2. Excavation and Tank Location................................11 19.1. General......................................................................26 <br /> 7.3. Depth of Excavation................................................12 20. Supplemental Materials <br /> 7.4. Depth of Cover........................................................12 20.1. General......................................................................26 <br /> 7.5. Tank Spacing...........................................................13 21. Retention of Installation Manual <br /> 8. Anchoring Systems 21.1. General......................................................................26 <br /> 8.1. General........................................................................14 <br /> 8.2. Anchor Straps.............................................................14 APPENDICES <br /> 8.3. Hardware and Anchor Points....................................15 A. Xerxes Tank Data Chart.....................................................27 <br /> 8.4. Deadmen.................................................................16 B. Xeres Primary Backfill Requirements............................28 <br /> 8.5. Xeres Prefabricated Deadmen...............................16 C. Xerxes Split Backfill Instructions.....................................29 <br /> 8.6. Anchor Slabs...........................................................17 <br /> 8.7. Man-Out-of-Hole(MOH)Straps..............................17 XERXES TANK INSTALLATION CHECKLJS E........30 <br /> 8.8. Aftemate Wet-Hole Anchoring Method...................17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.