My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VALPICO
>
550
>
2300 - Underground Storage Tank Program
>
PR0536555
>
INSTALL_2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2019 3:22:40 PM
Creation date
11/8/2018 9:57:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2012
RECORD_ID
PR0536555
PE
2351
FACILITY_ID
FA0020989
FACILITY_NAME
Arco. Am pm 83333
STREET_NUMBER
550
Direction
W
STREET_NAME
VALPICO
STREET_TYPE
Rd
City
Tracy
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
550 W Valpico Rd
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\V\VALPICO\550\PR0536555\INSTALL PLAN 2012.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5.226.1.Subtract Measurement#4 from Measurement#1 and mold 5.3.8.Proceed with POINTS 5.2.13. through 5.2.23.of the dry- <br /> it as the Deflection Measurement on the Tank Installation ChecMlst hole installation instructions. <br /> 5.2.29.Install reinforced concrete or asphalt,if used,at this 5.3.9.Ballast the tank once the backfill is even with the top of <br /> time.See SEC77ON 7.4. the tank.See SECTION 12. <br /> 5.2.29.1.The cover depth must meet the appropriate minimum 5.3.10.Proceed with POINTS 5.2.25. through 5.2.31, of the <br /> specified in SECTION 7.4. dry-hole installation instructions. <br /> 5.2.29.2.For installations in traffic conditions,all secondary 6. BACKFILL MATERIAL <br /> backfill used as subgrade backfill must be compacted with a <br /> hand-guided,vibrating-plate,mechanical compactor. 6.1. GENERAL <br /> 5.2.30.If the tank has a monitoring system,after backfilling is 6.1.1.Xerxes tanks shall be installed using select rounded <br /> completed and after top slab is in place(if used),perform nec- stones or crushed stones as primary backfill material.See <br /> essary monitoring checks.See SECTION 15. SECTION 6.2.for definition of primary backfill material. <br /> 5.2.31.Complete the Tank Installation Checklist. 6.1.2.Alternatively,Xerxes tanks shall be installed using pri- <br /> mary backfill vertically up to at least 75 percent of the tank di- <br /> 5.3. WET-HOLE INSTALLATION ameter and secondary backfill above the primary backfill.See <br /> 5.3.1.Follow the dry-hole installation instructions(SECTION SECTION 6.3.for definition of secondary backfill and Xerxes <br /> 5.2.)with the modifications listed below. Split Backfill Instructions,APPENDIX C,for more information <br /> 5.3.2.Perform POINTS 5.2.1. through 5.2.4.4.of the dry-hole regarding this alternative. <br /> installation instructions. 6.1.3.Using backfill material other than that specified in <br /> 5.3.3.Before performing POINT 5.2.5. of the dry-hole installa- POINTS 6.1.1.and 6.1.2.without prior written authorization <br /> tion instructions,pump water from the excavation hole and from Xerxes will void Xerxes'obligations under the limited <br /> continue pumping to maintain minimum water level during warranty. <br /> tank installation. CAUTION <br /> 5.3.3.1.Attempt to maintain the water level below the top of Using other than specified backfill material may cause tank <br /> the bedding materials until the tank can be fully backfilled and failure,or may result in damage to the tank and/or surround- <br /> ballasted. ing property. <br /> 5.3.4.Proceed with POINTS 5.2.5. through 5.2.9.1. of the dry- 6.2. PRIMARY BACKFILL <br /> hole installation instructions. 6.2.1.Primary backfill material must meet the following speci- <br /> 5.3.4.1.In high-water conditions,when Xerxes'preferred Man- fications: <br /> Out-of-Hole(MOH)anchoring method is not available or pos- 6.2.1.1. Material is to be clean,free-flowing,and free of dirt, <br /> sible,see SECTION 8.8.for an alternate method. sand,large rocks,roots,organic materials,debris,ice and <br /> 5.3.5.Proceed with POINTS 5.2.10. through 5.2.12.3.2. of the snow.Backfill material shall not be frozen or contain lumps of <br /> dry-hole installation instructions. frozen material at any time during placement. <br /> 5.3.6.In high-water conditions,where it is not possible to 6.2.1.2.An important characteristic of good backfill material is <br /> maintain the water level below the top of the bedding material hardness or stability when exposed to water or loads.Most <br /> during the entire installation,partially ballast the tank to firmly materials have no problem meeting the hardness requirement. <br /> seat the tank into the bedding material and to keep it from Materials like soft limestone,sandstone,sea shells or shale <br /> floating.See SECTION 12 for instructions. should not be used as backfill because they may break down <br /> over time. <br /> 5.3.7.The ballast level in the tank must either be lower than <br /> the backfill material or less than 12 inches above the water 6.2.1.3.When using select rounded stones,they must con- <br /> level in the hole.See FIGURE 5-2. form to the specifications of ASTM C 33,size numbers 6,67 <br /> or 7.See FIGURE 6-1 and Xerxes Primary Backfill Require- <br /> Liquid in tank must not exceed ments,APPENDIX B,for additional Information on backfill ma- <br /> water in hole by more than 12" terial specifications. <br /> III III Rounded Stone Crushed Stone <br /> IIII — _ �__- — II • <br /> I I II II Size numbers 6,67,7 Size numbers 7,9 <br /> I = <br /> FIGURE 5-2 FIGURE 6-1 <br /> 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.