My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VALPICO
>
550
>
2300 - Underground Storage Tank Program
>
PR0536555
>
INSTALL_2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2019 3:22:40 PM
Creation date
11/8/2018 9:57:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2012
RECORD_ID
PR0536555
PE
2351
FACILITY_ID
FA0020989
FACILITY_NAME
Arco. Am pm 83333
STREET_NUMBER
550
Direction
W
STREET_NAME
VALPICO
STREET_TYPE
Rd
City
Tracy
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
550 W Valpico Rd
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\V\VALPICO\550\PR0536555\INSTALL PLAN 2012.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8.3.11.Apply the first clip at a distance from the dead end of 8.4. DEADMEN <br /> the wire rope that is equal to the largest width of the clip used. 8,4,1,A deadman is typically a reinforced concrete beam and <br /> See FIGURE 8-5. should be designed according to the applicable American <br /> Concrete Institute code. <br /> 10clip 3t°Clip z"Clio 8.4.2.The length of a deadman is typically equal to the length <br /> Lige End Thimble of the tank. <br /> 8.4.3. Deadmen may be installed in multiple sections as long <br /> as the total length of the assembled deadman is appropriate <br /> for the installed tank,and as long as each section contains at <br /> Loop least two balanced anchor points. <br /> Dead End <br /> 8.4.4.The width and thickness of a deadman depends on the <br /> FIGURE 8-5 tank diameter,water-table height,number of containment <br /> 8.3.12.For each clip,apply a U-bolt over the dead end of the sumps and burial depth. <br /> wire rope.See FIGURE 8-5. <br /> 8.4.5.See TABLE 8-4 for typical deadmen dimensions for <br /> NOTE:Live end rests in the saddle. Xerxes tanks(other than 10-foot-diameter tanks with a capac- <br /> 8.3.13.When only 2 clips are required,apply the second clip 8y greater than 25,000 gallons),given the following scenario: <br /> as close to the loop or thimble as possible.See FIGURE 8-5. an empty tank,a 3-foot burial depth,groundwater to grade, <br /> and one containment sump. <br /> 8.3.14.When more than 2 clips are required,apply the second <br /> clip as Gose to the loop or thimble as possible,turn nuts on the Typical <br /> second Gip finely,but do not tighten initially.See FIGURE 8-5. Tank Diameter Deadman Dimensions <br /> 8.3.15.When more than 2 clips are required,space additional (Width x Depth) <br /> clips equally between the first 2,take up rope slack and 4' 12"x 1T <br /> tighten nuts on each U-bolt evenly. 6' 12"x 12" <br /> 8.3.16.Tighten all hardware uniformly and follow the manufac- 8' 1T x 12" <br /> turer's torque specifications.Double-check the tightness once <br /> the anchoring system is complete. 10' 18"x 9" <br /> 8.3.17.If forming a loop in the wire rope,a splice is required 12' 36"x 8" <br /> for connecting the two ends together. TABLE 8-4 <br /> 8.3.17.1.Standard rigging practice for splicing wire rope calls 8.4.5.1. If tanks are installed with any conditions different from <br /> for using twice the number of clips recommended for a single- those identified in POINT 8.4.5,and/or if tanks are 10-foot- <br /> end termination. diameter tanks with a capacity greater than 25,000 gallons, <br /> 8.3.17.2.Use a minimum of 4 clips for a 3/8-inch wire rope the installation may require either a deeper burial or deadmen <br /> and a minimum of 6 clips for a 1/2-inch wire rope. larger than those shown in TABLE 8-4. Contact technical sup- <br /> 8.3.17.3.Place the rope ends parallel to each other and install port at Xerxes Minneapolis, MN,for further information. <br /> the clips as shown in FIGURE 8-6. 8.4.6.Lay the deadmen in the excavation parallel to the tank <br /> and outside of the tank"shadow."See FIGURE 7-2. <br /> 318"Wire Rope 8.4.7. In installations where two or more tanks are installed <br /> 4 Live End4--Dead End using deadmen: <br /> .*—Load 8.4.7.1.a separate anchor point must be provided for each <br /> anchor strap <br /> Leed—► <br /> 8.4.7.2.the minimum spacing between the tanks must be <br /> End Ll"End III equal to or greater than the width of the deadman used for the <br /> tanks <br /> 112"Wire Rope <br /> 8.4.7.3.each tank will have its own set of deadmen, however, <br /> Live End 11, Deed End one deadman may be used between two tanks if the deadman <br /> ~LOQ is double the width of the single deadman specified for tanks <br /> - in SECTION 7. <br /> Load—► <br /> Dead Eno 111 Live End 0 8.5. XERXES PREFABRICATED DEADMEN <br /> 8.5.1.Xeres-supplied prefabricated deadmen are pre-engi- <br /> neered and sized to the tank ordered.As with any deadmen, <br /> FIGURE 8-6 water-table height,number of containment sumps and burial <br /> depth must be considered. <br /> 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.