My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VALPICO
>
550
>
2300 - Underground Storage Tank Program
>
PR0536555
>
INSTALL_2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2019 3:22:40 PM
Creation date
11/8/2018 9:57:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2012
RECORD_ID
PR0536555
PE
2351
FACILITY_ID
FA0020989
FACILITY_NAME
Arco. Am pm 83333
STREET_NUMBER
550
Direction
W
STREET_NAME
VALPICO
STREET_TYPE
Rd
City
Tracy
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
550 W Valpico Rd
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\V\VALPICO\550\PR0536555\INSTALL PLAN 2012.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
15.3.3.8.1.preinstallation air test 15.3.4.4.After determining the starting point,adjust the monk <br /> 15.3.3.8.2.rise in groundwater level toring fluid based on the product level. <br /> 15.3.3.8.3.backfill compaction 15.3.4.4.1.If the tank is between 1/4 and 1/2 full of product, <br /> the proper operating level for the monitoring fluid is at the <br /> 15.3.3.8.4.ballasting. starting point. <br /> 15.3.3.9.Check and record the monitoring-fluid level during 15.3.4.4.2.If the tank is between empty and 1/4 full,the <br /> the installation process.See the Tank Installation Checklist. proper operating level for the monitoring fluid is about 1 to 1- <br /> 15.3.4. SETTING THE LEVEL OF THE 1/2 inches below the starting point. <br /> MONITORING FLUID 15.3.4.4.3.If the tank is between 1/2 full and full,the proper <br /> 15.3.4.1.After backfilling and top-slab placement is com- operating level for the monitoring fluid is about 1 to 1-1/2 <br /> pleted,check the level of the monitoring fluid in the reservoir inches above the starting point. <br /> and set the monitoring fluid to the proper level. 15.3.4.5.Add or remove monitoring fluid to reach the proper <br /> NOTE:Failure to set the monitoring-fluid level property may operating level for the monitoring fluid. <br /> lead to false alarms. 15.3.4.6.If a TRUCHEK test is required after installation,follow <br /> 15.3.4.2.Once the tank is installed,the level of the monitoring the procedures in the Xerxes TRUCHEK brochure. <br /> fluid may fluctuate due to such things as: 15.3.4.6.1.After this test,reset the monitoring-fluid level to a <br /> 15.3.4.2.1.product level position based on the product level. <br /> 15.3.4.2.2.groundwater fluctuation 16. INSTALLING CONTAINMENT SUMPS <br /> 15.3.4.2.3.tank filling and emptying 16.1. GENERAL <br /> 15.3.4.2.4.product-temperature variation. 16.1.1.Xerxes containment sumps come in a variety of mod- <br /> 15.3.4.3.To establish the proper operating level for monitoring els and sizes,including single-wail and double-wall models, <br /> fluid,decide what type of monitoring probe will be used in and round and flat-sided models. <br /> order to determine the initial starting point for the level in the 16.1.1.1. Instructions for the different models are found in <br /> reservoir. Xerxes'supplemental materials.See SECTION 20 for informa- <br /> 15.3.4.3.1.The typical probe has two sensors(a high-fluid tion on where to obtain supplemental instructions. <br /> level and a low-fluid level).When using a two-sensor probe, 16.1.2.The containment sump provides an enclosure for a <br /> the starting point(the proper level for the monitoring fluid)is submersible pump and a termination point for secondary pip- <br /> midway between the two sensors. Ing systems. <br /> 15.3.4.3.2.If using something other than a two-sensor probe, 16.1.2.1.It provides containment of product from the pump <br /> use 7 inches from the top of the tank as the starting point for and/or piping connections. <br /> the monitoring-fluid level. <br /> 16.1.2.2.It is designed to be monitored continuously using <br /> NOTE:When using a probe,do not raise it off the tank to electronic sensors. <br /> meet the monitoring-fluid level.The probe must remain up- <br /> right and in contact with the top of the tank at all times.See 16.1.3.Consult federal,state and local codes and regulations <br /> FIGURE 15-2. to ensure proper monitoring compliance. <br /> 16.1.4.All Xerxes containment sumps must be isolated from <br /> traffic loads. <br /> Top slab(by others) 16.1.5.Before installing the containment sump,perform a vi- <br /> sual inspection of the sump for potential shipping damage. <br /> Vent reservoir/stand i Street box and electrical 16.1.6.If damage is detected,contact the plant from which <br /> P Pe hookup(by others) <br /> (by others) the tank was shipped. <br /> Standpipe(by others) 0 CAUTION <br /> Probe cable(by others) Always wear eye protection and gloves when handling, <br /> Reservoir grinding,cutting and attaching the containment sump unit. <br /> Probe(by others) Failure to do so may result in minor or moderate injury. <br /> Monitoring-fluid level CAUTION <br /> Tank rib(cut away for <br /> RV <br /> sensor placement) Do not drop the containment sump assembly components <br /> I'11 or allow the sump body to roll.Since high winds could dam- <br /> age the sump components,protect and secure all pieces if <br /> windy conditions arise. Failure to follow this caution may re- <br /> FIGURE 15-2 suit in damage to surrounding property. <br /> 23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.