My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1985-2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
930
>
2300 - Underground Storage Tank Program
>
PR0502817
>
COMPLIANCE INFO 1985-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2024 2:50:15 PM
Creation date
11/8/2018 9:58:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1985-2006
RECORD_ID
PR0502817
PE
2361
FACILITY_ID
FA0005584
FACILITY_NAME
VALLEY PACIFIC LODI PLANT & CARDLOCK
STREET_NUMBER
930
Direction
E
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04905023
CURRENT_STATUS
01
SITE_LOCATION
930 E VICTOR RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\V\VICTOR\930\PR0502817\COMPLIANCE INFO\COMPLIANCE INFO 1985-2006.PDF
QuestysFileName
COMPLIANCE INFO 1985-2006
QuestysRecordDate
5/19/2016 8:14:18 PM
QuestysRecordID
3086574
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
184
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
;816 9252816 a, <br /> 7- 6-05; 9:41AM;Secfemento EMC <br /> %N/ <br /> Customer Job Location Work Order 119676 <br /> Valley Pacific Cardlock Valley Pacific Cardlock Contact Pat Rooms @ Tankt <br /> 930 E.Victor Road 930 E.Victor Road Site No. <br /> Lodi,Ca. Lodi,Ca. <br /> MECHANICAL LEAK DETECTOR TEST <br /> Product: (911 Mfg Model# Serial# <br /> Submerged Pump: Red Jacket P7551 100121298-2826 <br /> Leak Detector: Red Jacket 116-056 40398-8010 <br /> Leak Detector Opening Time Test <br /> i <br /> 1 Turn on Pump and record the stop,-through time from 0 psi to full pressure. 15 sec !' <br /> Functional Element Operation Test ! <br /> 2 Pump Running Pressure 24 PS I' <br /> 3 Shutoff Pressure 14 PS <br /> Resiliency Test(Bleed back) <br /> 4 Drain and measure amount of product from shutoff pressure to 0 psi. 75 MI <br /> 10 PSI Calibration <br /> 5 Using the calibration valve,create the proper leak rate @ 10 psi. 192 MI <br /> Confirm test leak @(per rninute) <br /> Simulated Leak Test <br /> 6 With the simulated leak in the line active,dispense product from the nozzle. 1.2 GP <br /> Confirm flow rate through the nozzle @ <br /> Bottom Line (There are two tests the leak detector must pass In order for it to be considered acceptable.) <br /> Pass Fai <br /> 7A Leak Detector-Opening Time Test X <br /> 7B Leak Simulated Test Pass Fai; <br /> Flow rate through nozzle <br /> X <br /> LEAK DETECTOR MUST PASS BOTH TEST IN#7 Pass Fail <br /> X <br /> Technician: Test Date: <br /> Performed by: Sacramento Equipment Maintenance Company,Inc <br /> 2533 Commie Drive Connie Drive <br /> Sacramento,CA 95815 <br /> 916-925-2716 916-925-2816 FAX <br />
The URL can be used to link to this page
Your browser does not support the video tag.