My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1985-2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
930
>
2300 - Underground Storage Tank Program
>
PR0502817
>
COMPLIANCE INFO 1985-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2024 2:50:15 PM
Creation date
11/8/2018 9:58:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1985-2006
RECORD_ID
PR0502817
PE
2361
FACILITY_ID
FA0005584
FACILITY_NAME
VALLEY PACIFIC LODI PLANT & CARDLOCK
STREET_NUMBER
930
Direction
E
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04905023
CURRENT_STATUS
01
SITE_LOCATION
930 E VICTOR RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\V\VICTOR\930\PR0502817\COMPLIANCE INFO\COMPLIANCE INFO 1985-2006.PDF
QuestysFileName
COMPLIANCE INFO 1985-2006
QuestysRecordDate
5/19/2016 8:14:18 PM
QuestysRecordID
3086574
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
184
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Apr 15 04 08: 20a _ Va"- "tm Pacific Petroleum 209 ,•""`3 1519 P-S <br /> Message Page 2 of 4 <br /> •The MLD-E(gray in color)is designed for use with <br /> some flexible piping systems with a high modulus of <br /> elasticity. <br /> Always follow MLD Installelion instructions in flexible <br /> piping systems to determine if model MLD-E(gray)or <br /> the standard MLD(blue)model is required to detect a 3 <br /> GPH line leak. <br /> SPECIFICATIONS: <br /> Capable of detecting 3 GPH line leaks at 10 psi(11.4 LPH at.68 bar)- <br /> Once in the open position,MLD remains open during product delivery to pressures as low as 1 <br /> psi-Therefore,the MLD will never close when several nozzles are open at the same dme- <br /> -3rd party certifled to comply with US EPA requirements 280.41 (s)and 280.44{A)forcontinuous <br /> monitoring of pressurized piping, <br /> -UL listed for installation in all 4"FE Petro pumps arta most competitive makes. <br /> •Compatible with all blends of motor fuels Including alcohol blends from 0 to 100%ethanol or <br /> methanol,2004'MTBE or ETRE with 80%gasoline,or 17%TAME with 83%gasoline as well as <br /> diesel fuels. <br /> MLD signals a fine leak by allowing less than 3 GPM{11 .4 LPM)restricted flow rate,at leak sizes <br /> of 3 GPH or greater.Leaks of less than 3 GPH are indicated by the leak detector taking longer than <br /> 2 to 3 seconds to open. <br /> •Time required to make a One test is 2 to 3 seconds when no line leaks exist and air is purged from <br /> piping. <br /> •Maximum static head on MLD is f2 feet(3,35 m)from tank to dispensing point <br /> •Weight:9.2 pounds(4,2 kg). <br /> •Minimum height requirement from 2"NPT port to manhole cover for clearance is 9"(22.9 cm), <br /> OPERATING CHARACTERISTICS: <br /> The FS Petro STIs-MLt71eak deteeter is a tote position,pmssure-sensing,piston operated valve <br /> designed to conUnuousiy monitor the piping by indicating any leakage in the piping between the <br /> discharge and the submersible:pump and the solenoid valve In a service station dispenser. <br /> When the submerged pump is turned on after the system pressure has dropped significantly below <br /> the normal state system pressure,three GPH(at 10 ps0 is metered through the STP-MLD into the <br /> piping system-If leak is present that equals or exceeds this amount, as much product escapes <br /> from the system as is metered through the STP-MLD. Under this condition,pressure cannot build <br /> up in the piping system When a nozzle is opened, a poppet in the STP-MLD moves to a position <br /> that restricts the flow to 2 GPM.This is the indication to the operator that a leak is:present if there <br /> are no leaks,pressure rapidly builds in the system forcing the STP-MLD to open to the full-flow <br /> position. In a system with no leaks,it takes approximately three seconds fora complete test. No <br /> further line testing takes place until the line pressure drops significantly below the normal static <br /> system pressure. <br /> 4113/04 <br /> 8l 39t/d 210D"1-A Hl aid F.F.bf.AQbFR7. I7:c7 ena..i�r�ca <br />
The URL can be used to link to this page
Your browser does not support the video tag.