My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1985-2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
930
>
2300 - Underground Storage Tank Program
>
PR0502817
>
COMPLIANCE INFO 1985-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2024 2:50:15 PM
Creation date
11/8/2018 9:58:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1985-2006
RECORD_ID
PR0502817
PE
2361
FACILITY_ID
FA0005584
FACILITY_NAME
VALLEY PACIFIC LODI PLANT & CARDLOCK
STREET_NUMBER
930
Direction
E
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04905023
CURRENT_STATUS
01
SITE_LOCATION
930 E VICTOR RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\V\VICTOR\930\PR0502817\COMPLIANCE INFO\COMPLIANCE INFO 1985-2006.PDF
QuestysFileName
COMPLIANCE INFO 1985-2006
QuestysRecordDate
5/19/2016 8:14:18 PM
QuestysRecordID
3086574
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
184
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. In-Tank Gauging/SIR Equipment: Q Check this box if tank gauging is used only for inventory control. <br /> 0 Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to pert leak detection monitoring. <br /> Co fete the foltowin checklist: <br /> Yes ❑ No' f Has all Input wiring been inspected 5pp6par entry and[amination,including testing for ground faults? <br /> Q Yes j Q No* I Were all tank ganging probes y inspected for damage and residue buildup? <br /> ❑ Yes Q No- Was accuracy of system a level readings tested? <br /> 0 Yes O NO Was accuracy of em Mit readings Tested? <br /> 0 Yes Q No* Were all p s reinstalled properly? <br /> Q Yes Q No" Acre items on the equipment manufacturer's main=mce checklist completed? <br /> y In the S;'�k <br /> n$ w,describe how and when these deficiencies were or will be corrected. <br /> G. DebeCbors(LLD): Q Check this box if LLDs are not installed. <br /> m ete the following checldisL <br /> Z'yes Q No* For equipment start-up or annual equipmegt cywficatiou, was a leak simulated to verify LLD performance! <br /> Q NIA (Check all that apply) Simulated leak rate! ULI g.pL.: Q 0,1 g p.h: 1101 g.p.h. <br /> Q No* Were all LLDs confirmed operational and accurate within regulatory mquirements? <br /> Y O No* Was the testing apparatus properly calibrated? <br /> es ❑ No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> Q N1A <br /> ❑ Yes Q No" For electronic LLDs,does the turbine automatically shut off ifitte I r n efcreers a leak? <br /> ❑ NIA <br /> Q Yes Q No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> Q Nl0. oc diuonucctad? <br /> ❑ Yes Q Noy For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions <br /> Q WA or NIS a test? <br /> Ey <br /> D No* For electronic LLDs.have all accessible wiring connections been visually inspected? <br /> ❑ NIAQ No* I Were all items on the equipment mantrfscnnees maintenance checklist completed? <br /> *In tlueSeet'wu H,blow,describe Flow and wben these denciand"were or wU be earrecterl_ <br /> H. Comments: <br /> Page of 3 OYal <br />
The URL can be used to link to this page
Your browser does not support the video tag.