My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1985-2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
930
>
2300 - Underground Storage Tank Program
>
PR0502817
>
COMPLIANCE INFO 1985-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2024 2:50:15 PM
Creation date
11/8/2018 9:58:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1985-2006
RECORD_ID
PR0502817
PE
2361
FACILITY_ID
FA0005584
FACILITY_NAME
VALLEY PACIFIC LODI PLANT & CARDLOCK
STREET_NUMBER
930
Direction
E
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04905023
CURRENT_STATUS
01
SITE_LOCATION
930 E VICTOR RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\V\VICTOR\930\PR0502817\COMPLIANCE INFO\COMPLIANCE INFO 1985-2006.PDF
QuestysFileName
COMPLIANCE INFO 1985-2006
QuestysRecordDate
5/19/2016 8:14:18 PM
QuestysRecordID
3086574
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
184
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P�t1'RJ <br /> Contractors License 0692238 fir(, � Post Office Box 7169 <br /> (530) 878-6834 • Fax(530)87&6438 RUCTIO Auburn,California 95604 <br /> May 15, 2003 <br /> To: Mike Eliason <br /> Valley Pacific Petroleum Services <br /> 166 Frank West Circle <br /> Stockton, CA. <br /> From: ScottJohoson: <br /> Re; ' Scope of work for repairs to containment piping at Victor Rd. CFN Cardloc:k <br /> in Lodi, CA, <br /> I. Sawcut and remove concrete along gasoline island, 3' wide x 15' tong adjacent to <br /> dispenser island and over top of buried piping.. <br /> 2, Excavate to expose product piping at connection to bottom of Bravo Box <br /> dispenser containment sump, <br /> 3. Remove and replace or repair leaking connection as required to pass pressure le�_ <br /> 4. Coordinate inspections with San Joaquin County Environmental Health. <br /> 5. Backfill using excavated pea gravel. Place and finish concrete to snatch existing <br /> elevation and thickness. <br /> Estimated time of to 5 days to complete project depending on required testing and <br /> utspections. <br /> Estimated cost to complete project, S 6,500.00 <br /> JPC will bill on a time and material basis for above scope of work. <br /> Please call me if you haverany questions. _ <br /> Thank you. <br /> Scott Johnson. <br />
The URL can be used to link to this page
Your browser does not support the video tag.