My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_JUN 2016 - 2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
930
>
2300 - Underground Storage Tank Program
>
PR0502817
>
COMPLIANCE INFO_JUN 2016 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2019 4:51:00 PM
Creation date
11/8/2018 9:58:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
JUN 2016 - 2018
RECORD_ID
PR0502817
PE
2361
FACILITY_ID
FA0005584
FACILITY_NAME
VALLEY PACIFIC LODI PLANT & CARDLOCK
STREET_NUMBER
930
Direction
E
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04905023
CURRENT_STATUS
01
SITE_LOCATION
930 E VICTOR RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\V\VICTOR\930\PR0502817\COMPLIANCE INFO\COMPLIANCE INFO JUN 2016 - PRESENT.PDF
QuestysFileName
COMPLIANCE INFO JUN 2016 - PRESENT
QuestysRecordDate
9/13/2016 6:46:00 PM
QuestysRecordID
3135584
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
View images
View plain text
Monitoring System Certification ' D D <br /> D. Results of Testing/Servicing <br /> Software Version Installed: 329.00 <br /> Complete the following checklist: EN v n'i=-''" -i`i)AL HEALTH <br /> N Yes ❑ No* Is the audible alarm operational? <br /> N Yes ❑ No* Is the visual alarm operational? <br /> N Yes ❑ No* Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> N Yes ❑ No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with their proper operation? <br /> ❑ Yes ❑ No* If alarms are relayed to a remote monitoring station, is all communications equipment (e.g., modem) <br /> N N/A operational? <br /> N Yes ❑ No* For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br /> ❑ N/A monitoring system detects a leak,fails to operate,or is electrically disconnected? If yes: which sensors initiate <br /> positive shut-down? (Check all that apply) N Sump/Trench Sensors; ❑Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection? N Yes; ❑No. <br /> ❑ Yes ❑ No* For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e., no <br /> N N/A mechanical overfill prevention valve is installed), is the overfill warning alar visible and audible at the tank <br /> fill point(s)and operating properly? If so,at what percent of tank capacity does the alar trigger? _% <br /> ❑ Yes* N No Was any monitoring equipment replaced? If yes, identify specific sensors,probes,or other equipment replaced <br /> and list the manufacturer name and model for all replacement parts in Section E,below. <br /> ❑ Yes* N No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br /> ❑Product; ❑Water. If yes,describe causes in Section E,below. <br /> N Yes ❑ No* Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports,if applicable <br /> N Yes ❑ No* Is all monitoring equipment operational per manufacturer's specifications? <br /> * In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: <br /> UN-036— w .unidocs.org Rev.01/17/08 <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).