My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
6732
>
2300 - Underground Storage Tank Program
>
PR0231830
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:38:43 PM
Creation date
11/8/2018 9:59:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0231830
PE
2361
FACILITY_ID
FA0004030
FACILITY_NAME
THREE PALMS GROCERY
STREET_NUMBER
6732
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
10110001
CURRENT_STATUS
02
SITE_LOCATION
6732 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\W\WATERLOO\6732\PR0231830\COMPLIANCE INFO.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
196
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
utsu"ucuuus V Vtit►1iluleul Iesting an, ertillcation <br /> General Instructions <br /> I. Equipment that monitors underground storage tank systems containing hazardous materials must be tested/sen <br /> annually.or on a schedule specified by the manufacturer, whichever is more frequent. <br /> 2. This certification form must be used to document the following activities: I.) Periodic testing as described ah., ' <br /> 2.) Testing of new monitoring systems upon installation; 3.) Testing of replacement sensors, probes, of ','I" ' <br /> system components; and 4.)Testing of repaired sensors,probes,'or other system components. <br /> 3. As noted on Page 1, a separate certification fifrm must be competed for each individual monitoring system c""""I <br /> panel. For example: If one control panel monitors in-tank gauging probes and another panel monitors electron , <br /> leak detectors, two certification forms would be required. <br /> 4. Be aware that many local agencies require that a permit be obtained REjor to installing new monitoring systei" <br /> components. Check with your local agency for their requirements before starting work. <br /> Section B <br /> 1. In the Tank ID sections, describe which tanks you worked on (e.g. Diesel Tank. North Tank,Middle Tank). <br /> 2. For compartmented tanks, list each compartment as a separate tank. <br /> 3. Where "Model" is asked for,the name of the manufacturer and the manufacturer's specific model name or numbt•f, its <br /> referenced in the "List of Leak Detection Equipment and Methods for Underground Storage Tanks" (i.e. LG I I t <br /> must be specified. <br /> 4. Hands-on functional testing of individual leak detection components to confirm operability to manufacim"I ' <br /> specifications and state regulations is required. This includes verifying any automatic shut-off features. In the <br /> of sensors that can not be non-destructively tested, contact your local agency that regulates UST systems to w, tf <br /> they will approve alternate testing methods(e.g. testing of representative samples). <br /> Section C <br /> 1. Certification must be made by a state-registered technician. <br /> 2. All work associated with testing/servicing of equipment must be performed by or under the direct supervision III l" <br /> certifying technician. <br /> Section D <br /> f <br /> 1. Leak sensors must be reinstalled at the low points of the secondary containment systems they monitor and posit f"0111 <br /> so that other equipment will not interfere with their proper operation. <br /> 2. When testing operability of positive turbine shut-down, you must: 1.) verify shut-down by simulating a leak: ;11141 <br /> verity shut-down by disconnecting the sensor. <br /> Site Plan <br /> You must attach a Site Plan showing the general layout of lanks.and piping. Clearly identify locations of the fallim""' <br /> equipment, if installed: monitoring system control panels; sensors monitoring tank annular spaces, sumps, dispel"' ' <br /> pans, spill containers. or other secondary containment areas; mechanical or electronic line leak detectors; and iu u""' <br /> liquid level probes (ifused for leak detection). Note the date the Site Plan was prepared <br />
The URL can be used to link to this page
Your browser does not support the video tag.