My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2005 - 2008
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
4040
>
2300 - Underground Storage Tank Program
>
PR0231963
>
COMPLIANCE INFO_2005 - 2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2019 3:06:28 PM
Creation date
11/8/2018 9:59:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005 - 2008
RECORD_ID
PR0231963
PE
2361
FACILITY_ID
FA0006445
FACILITY_NAME
PG&E: Stockton Service Center
STREET_NUMBER
4040
STREET_NAME
WEST
STREET_TYPE
Ln
City
Stockton
Zip
95204
APN
117-020-01
CURRENT_STATUS
01
SITE_LOCATION
4040 West Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\W\WEST\4040\PR0231963\COMPLIANCE INFO 2005 - 2008.PDF
QuestysFileName
COMPLIANCE INFO 2005 - 2008
QuestysRecordDate
8/2/2018 5:38:18 PM
QuestysRecordID
3952805
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
482
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MONITQ&NG SYSTEM CERTI " ATION <br /> Fo e By All Jurisdictions Within the State of C' is <br /> Authority Cited.• Chapter 6.7, Health and Safety Code; Chapter 16,Division 3; Title 23, California Code ofRegulations <br /> This form must be used to document testing and servicing of monitoring equipment: If more than one <br /> monitoring system control panel is installed at the facility, a separate certification or report must be prepared for <br /> each monitoring_system control panel by the technician who performs the work. A copy of this form must be <br /> provided to the tank system owner/operator. The owner/operator must submit a copy of this form to the local <br /> agency regulating UST systems within 30 days of test date. Instructions are printed on the back of this page: <br /> A. General Information <br /> Facility Name: Jej(TZe Bldg.No:: <br /> Site Address: City; Zip: <br /> Facility Contact Person E�7v-i C(, /J 6(o, Contact Phone No.: <br /> MakeJModel of Monitoring System: %�S :SS 6 Date of Testing/Servicing: fY OS <br /> B. Inventory of Equipment Tested/Certified <br /> Check the appLogriate boxes to indicate§gecific equipment ins iectedfserviced: <br /> Tank ID: 1?e?, Tank ID: <br /> AIn-Tank Gauging Probe. Model: 13 In-Tank Gauging Probe. Model: <br /> W Annular Space or Vault Sensor. Model: V o Q Annular Space or Vault Sensor. Model: <br /> W Piping Sump/Trench Sensor(s). Model: 3 Z./ ❑ Piping Sump/Trench Sensor(s). Model: <br /> ❑ Fill Sump Sensor(s). Model: ❑Fill Simp Seuor(s). Model <br /> idMechanicalLine Leak Detector. Model: 1LI ❑Mechanical Line Leak Detector. Model: <br /> ❑Electronic Line Leah Detector. Model: ❑Electronic Line Leak Detector. Model: <br /> ❑ Tank Overfill/High-Level Sensor. Model: ❑ Tank Overfill/High-Level Sensor. Model: <br /> L'Dispeiser Containment Seawr(s). Model: 1Z,/ ❑,Dispenser Containment inment Sensor(s). Model- <br /> ❑ Shear Valve(s). ❑ Shear Valve(s). <br /> ❑Dispenser Containment Float(s)and Chain(s). ❑ Dispenser Containment Float(s)and Chaio(s). <br /> ❑ Other ec' Equipacat a and model in Section E on Page 2). ❑ Other 2g'5 ui ment tMe,and model in Section E on Pa 2). <br /> Tank ID: Tank ID: <br /> OIn-Tank Gauging Probe. Model: Ll in-Tank Gauging Probe. Model: <br /> ❑Annular Space or Vault Sensor. Model: ❑ Annular Space or Vault Sensor. Model: <br /> ❑.Piping Sump/Trench Sensor(s). Model: - ❑Piping Sump/Trench Sensor(s). Model:- <br /> Q Fill Sump Sensor(s).. Model: O Fill Sump Sensor(s). Model: <br /> Q Mechanical Line Leak Detector. Model ❑Mechanical Line Leak Detector. Model: <br /> U Electronic Line Leak Detector. Model: ❑Electronic Line Leak Detector. Model: <br /> ❑Tank Overfill/high-Level Sensor. Model:' ❑Tank Overfill/Iligh-Level Sensor. Model: <br /> 11 Dispenser Containment Sensor(s). Model: U Dispenser Containment Seiasor(s). Model: <br /> ❑ Shear Valve(s). ❑ Shear Valve(s). <br /> ❑Dispenser Containment Float(s)and Chain(s). ❑ Dispenser Containment Float(s)and Chain(s). <br /> ❑ Other ec ui m®t a and model in Section E-on Pa 2 . ❑ Other ec'�meat a and model in SectionE on Pa 2. <br /> C. Certification - I certify that the equipment identified in this document was inspected/serviced in accordance with the <br /> manufacturers' guidelines. Attached to this Certification is information(e.g. manufacturers' checklists) netzssary to <br /> verify that this information is correct and a Site Plan showing the layout of monitoring equipment. For any equipment <br /> capable of generating such reports,I have also attached a copy of the(check all that apply): ❑System set-up report; <br /> je ❑Alarm history report <br /> Technician Name(print): �O/IHJT! /J Cert./Lic.No.: 4945 6-o5-alta kure <br /> Testing Company Name: �C �%g� Phone No.: Sia 7Sf/P7�y <br />
The URL can be used to link to this page
Your browser does not support the video tag.