My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009 - 2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
4040
>
2300 - Underground Storage Tank Program
>
PR0231963
>
COMPLIANCE INFO_2009 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2019 2:59:06 PM
Creation date
11/8/2018 9:59:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009 - 2015
RECORD_ID
PR0231963
PE
2361
FACILITY_ID
FA0006445
FACILITY_NAME
PG&E: Stockton Service Center
STREET_NUMBER
4040
STREET_NAME
WEST
STREET_TYPE
Ln
City
Stockton
Zip
95204
APN
117-020-01
CURRENT_STATUS
01
SITE_LOCATION
4040 West Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\W\WEST\4040\PR0231963\COMPLIANCE INFO 2009 - 2015.PDF
QuestysFileName
COMPLIANCE INFO 2009 - 2015
QuestysRecordDate
8/2/2018 4:41:39 PM
QuestysRecordID
3952362
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
345
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
San Joaquin County <br /> Environmental Health Department DIRECTOR <br /> Donna Heran.REHS <br /> 600 East Main Street <br /> Stockton,a: 4�rco?% a California 95202-3029 PROGRAM COORDINATORS O <br /> Jeff <br /> McClellan REHS <br /> _ fCao.REHS.RDl <br /> REHS <br /> Website: v19O g Linda TurkatteREHS <br /> Phone: <br /> (209)468-3420 <br /> Fax: (209)464-0138 <br /> APPLICATION FOR UNDERGROUND STORAGE TANK <br /> RETROFIT OR PIPING REPAIR PERMIT <br /> [] 1. Submit all information in triplicate. Answer all questions, leaving no blanks. One copy will be returned to <br /> the applicant with comments. <br /> [] 2. Include a detailed site map on a separate sheet of paper showing all work to be done. Include the location <br /> of the tanks(s), piping, all tank-related appurtenances, streets, adjacent properties (north toward the top of the <br /> page), nearby septic tanks, leachfields, water wells, buildings, underground public utility lines (including water, <br /> sanitary sewer and storm sewer), and distance of piping from tank to dispensers. If underground utilities are <br /> not included on the site map, you must state in writing that USA Dig will be contacted prior to excavation <br /> activities. <br /> [] 3. Complete pages 3-6, "APPLICATION FOR UNDERGROUND STORAGE TANK RETROFIT OR PIPING <br /> REPAIR PERMIT". NOTE: If sampling is required sampling firm shall be an independent third Darty from the <br /> contractor performing the work. <br /> [] 4. Complete page 7, "Authorization to Release". This form must be signed and dated by the <br /> OWNER/OPERATOR of the facility. <br /> [] 5. Submit a completed "Service Request"form and "Underground Storage Tank Program Fee Worksheet". <br /> [] 6. If performing any excavation activities, and the facility is located outside of the city limits, submit a"Backfill <br /> Excavation Certificate" as required by the San Joaquin County Building Department. If a "Backfill <br /> Excavation Certificate" is required by any incorporated areas (cities), submit to the appropriate City Building <br /> Departments, pursuant to the Uniform Building Code STD 70-11. <br /> [] 7. The maximum review time for Plan Review is 15 working days from receipt of the adequately completed <br /> plan. If gross deficiencies are identified, an addendum will be required with a $122.00 per hour fee and the <br /> review will begin on the date of resubmittal. <br /> [] 8. Advance inspection notice of at least 48 hours is required by the Environmental <br /> Health Department (EHD). <br /> [] 9. Contractor to Provide: Combustible/Flammable gas detector (to verify the Lower Explosive Limit (LEL) <br /> atmosphere and oxygen level), adequate number(s) and appropriate type(s) of fire extinguisher(s), and <br /> barriers to secure the area as necessary to minimize traffic and pedestrian interference. It shall be the project <br /> manager's responsibility for compliance with all health & safety regulations and requirements, including <br /> confined space requirements, which shall be strictly adhered to at all times during the course of the <br /> underground storage tank(UST)activities. <br /> [] 10. The EHD permit shall be on site during all UST permit-related activities. <br /> [] 11. Any changes in this document shall be approved by the EHD prior to initiating work. All changes to any <br /> work must be described in detail on pages 3 &4 and be shown on the detailed site map. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.