My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009 - 2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
4040
>
2300 - Underground Storage Tank Program
>
PR0231963
>
COMPLIANCE INFO_2009 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2019 2:59:06 PM
Creation date
11/8/2018 9:59:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009 - 2015
RECORD_ID
PR0231963
PE
2361
FACILITY_ID
FA0006445
FACILITY_NAME
PG&E: Stockton Service Center
STREET_NUMBER
4040
STREET_NAME
WEST
STREET_TYPE
Ln
City
Stockton
Zip
95204
APN
117-020-01
CURRENT_STATUS
01
SITE_LOCATION
4040 West Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\W\WEST\4040\PR0231963\COMPLIANCE INFO 2009 - 2015.PDF
QuestysFileName
COMPLIANCE INFO 2009 - 2015
QuestysRecordDate
8/2/2018 4:41:39 PM
QuestysRecordID
3952362
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
345
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9255517899 Line 1 19:31 P.M. 10-19-2010 4/8 <br /> SWRCB,January 2002 Page 3 of 7 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: G Piping Manufacturer 9 Industry Standard 0 Professional Engineer <br /> 0 Other(Specify) <br /> Test Method Used: R Pressure 0 Vacuum 0 Hydrostatic <br /> 0 Other(Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> Piping Rim k Piping Run# Piping Run# Piping Run# <br /> Piping Material: Fiberglass <br /> Piping Manufacturer: Amron <br /> Piping Diameter: 2 X 3 <br /> Length of Piping Run: 30' <br /> Product Stored: Used Oil <br /> Method and location of Test Boot <br /> i in -run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 15 min <br /> starting test: <br /> Test Start Time: 10:00 am <br /> Initial Reading(R,): 5 psi <br /> Test End Time: 11:00 am <br /> Final Reading(RF): 5 psi <br /> Test Duration: 1 hour <br /> Change in Reading(RrRt): 0 <br /> Pass/Fail Threshold or 0 <br /> Criteria: <br /> Test Result: 10 Pass 0 Fail 0 Pass 0 Fail 0 Pass 0 Fail 0 Pass 0 Fail <br /> Comments—(include information on repairs made prior to testing,and recommended follow-upforfailed tests) <br /> Replaced 4"x 36"flex boot. Retested. <br />
The URL can be used to link to this page
Your browser does not support the video tag.