Laserfiche WebLink
From:Werrtkll Geyer Fax:(714)676-2499 To:2094683433@rcfax.ew Fax: +12094883433 to 3 of 11 10106=1 610:38 AM <br /> F.In-Tmdc Gauging/SIR Equipment P r"/'1',{IY�L(`I�V/E E) <br /> ❑X Check this box if tank gauging is used only for ° <br /> ❑ Check this box if no tank gauging or SIR equipment is installed <br /> OCT 06'2015 <br /> This section mustbe completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Completethefoilowh cheek)+6t: ENVIRONMENTAL <br /> ..,..._. -—.�—. �..�—.x.—:.... W.�: �..ti—:..:.-;.- <br /> ❑Yes ❑No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults9 <br /> anm�xinmrxsexasuroeeuasmwmt�w am �r�ucnw^u�;,mm�mrezvrom+cJeesaw,rarRmamrtnnnmvmnewuamm. <br /> ❑Yes ❑No* were all tank gauging probes visually inspected for dans age and residue buil chip? <br /> uaxvsrAmrcF;ua�rero��a.ezrexvrari. eom ue <br /> �1 ❑Yes ❑No* Was accuracy of system product level readings tested? i <br /> urzwarxavvam ��nrwxana�weweaea �mummessmemazm znwromnrn%remnrzamnmsrsunanwmnxr�,wmau . <br /> ' ❑Yes ❑Na* Was accuracy of system water level readings tested? <br /> xirsxanenva; wmwrnar„mwexr <br /> ❑Yes ❑No* Were all probes reinstalled property? I; <br /> ap.�mavx�mxsrs <br /> ❑Yes ❑No* were all items on <br /> egtnpmentmanufacturer's mairrtenance checklist completed'? II <br /> .r.._;(; _ _ �,w --- <br /> [nthe Sedion H.._....-_. __..cribeh lenc.rc.._.._.. — <br /> below,describe how andwhen those defidendes were or wil be wrrrNed. <br /> G.Line Leak Detectors(LLD): ❑ Check this box if LLDs are not installed. <br /> Complete the followi checklist: <br /> ❑X Yes ❑Na* For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance?(Check <br /> ❑N/A all that apply)Simulated leak rate: 0 3gp.h.; ❑0.1 gph;❑0.2 g.ph. <br /> ❑X Yes ❑No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ❑X Yes ❑No* Was the testing apparatus properly calibrated?v_...--.----------.__._..__._._—_—.--.•----, <br /> ❑Yes ❑No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ©N/A <br /> k ❑No* For electronic LLDs,does the turbine automatically shut off if the LLDdetects a leak? — —�-- <br /> ❑N/A <br /> ❑No* For electronic LLDs,does the turbine automatically shut offif anyportion of the monitoring system is disabled or <br /> ❑N/A disconnected? <br /> ❑Nos For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or <br /> ❑X N/A fat is a test? <br /> ❑No* For electronic LLDs,have all accessible wirirg connections been visually inspected?❑X N/A[—]No* Were all items onthe equipment manufacturer's mairionance checklist completed? <br /> "IntheSedion 19,below,describe how aryl whey—the—se—deficiencies were or will becorreded. <br /> H. Com merits: <br />