My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009 - 2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
4040
>
2300 - Underground Storage Tank Program
>
PR0231963
>
COMPLIANCE INFO_2009 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2019 2:59:06 PM
Creation date
11/8/2018 9:59:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009 - 2015
RECORD_ID
PR0231963
PE
2361
FACILITY_ID
FA0006445
FACILITY_NAME
PG&E: Stockton Service Center
STREET_NUMBER
4040
STREET_NAME
WEST
STREET_TYPE
Ln
City
Stockton
Zip
95204
APN
117-020-01
CURRENT_STATUS
01
SITE_LOCATION
4040 West Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\W\WEST\4040\PR0231963\COMPLIANCE INFO 2009 - 2015.PDF
QuestysFileName
COMPLIANCE INFO 2009 - 2015
QuestysRecordDate
8/2/2018 4:41:39 PM
QuestysRecordID
3952362
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
345
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
From:Werrtkll Geyer Fax:(714)676-2499 To:2094683433@rcfax.ew Fax: +12094883433 to 3 of 11 10106=1 610:38 AM <br /> F.In-Tmdc Gauging/SIR Equipment P r"/'1',{IY�L(`I�V/E E) <br /> ❑X Check this box if tank gauging is used only for ° <br /> ❑ Check this box if no tank gauging or SIR equipment is installed <br /> OCT 06'2015 <br /> This section mustbe completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Completethefoilowh cheek)+6t: ENVIRONMENTAL <br /> ..,..._. -—.�—. �..�—.x.—:.... W.�: �..ti—:..:.-;.- <br /> ❑Yes ❑No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults9 <br /> anm�xinmrxsexasuroeeuasmwmt�w am �r�ucnw^u�;,mm�mrezvrom+cJeesaw,rarRmamrtnnnmvmnewuamm. <br /> ❑Yes ❑No* were all tank gauging probes visually inspected for dans age and residue buil chip? <br /> uaxvsrAmrcF;ua�rero��a.ezrexvrari. eom ue <br /> �1 ❑Yes ❑No* Was accuracy of system product level readings tested? i <br /> urzwarxavvam ��nrwxana�weweaea �mummessmemazm znwromnrn%remnrzamnmsrsunanwmnxr�,wmau . <br /> ' ❑Yes ❑Na* Was accuracy of system water level readings tested? <br /> xirsxanenva; wmwrnar„mwexr <br /> ❑Yes ❑No* Were all probes reinstalled property? I; <br /> ap.�mavx�mxsrs <br /> ❑Yes ❑No* were all items on <br /> egtnpmentmanufacturer's mairrtenance checklist completed'? II <br /> .r.._;(; _ _ �,w --- <br /> [nthe Sedion H.._....-_. __..cribeh lenc.rc.._.._.. — <br /> below,describe how andwhen those defidendes were or wil be wrrrNed. <br /> G.Line Leak Detectors(LLD): ❑ Check this box if LLDs are not installed. <br /> Complete the followi checklist: <br /> ❑X Yes ❑Na* For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance?(Check <br /> ❑N/A all that apply)Simulated leak rate: 0 3gp.h.; ❑0.1 gph;❑0.2 g.ph. <br /> ❑X Yes ❑No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ❑X Yes ❑No* Was the testing apparatus properly calibrated?v_...--.----------.__._..__._._—_—.--.•----, <br /> ❑Yes ❑No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ©N/A <br /> k ❑No* For electronic LLDs,does the turbine automatically shut off if the LLDdetects a leak? — —�-- <br /> ❑N/A <br /> ❑No* For electronic LLDs,does the turbine automatically shut offif anyportion of the monitoring system is disabled or <br /> ❑N/A disconnected? <br /> ❑Nos For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or <br /> ❑X N/A fat is a test? <br /> ❑No* For electronic LLDs,have all accessible wirirg connections been visually inspected?❑X N/A[—]No* Were all items onthe equipment manufacturer's mairionance checklist completed? <br /> "IntheSedion 19,below,describe how aryl whey—the—se—deficiencies were or will becorreded. <br /> H. Com merits: <br />
The URL can be used to link to this page
Your browser does not support the video tag.