Laserfiche WebLink
0 0 <br /> UST SYSTEM RETROFIT OR REPAIR <br /> (Submit minimum of 3 sets of plans&applications as originals will be retained by EHD) <br /> t. Site map enclosed? YES`[dl NO[1 <br /> 2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates for each <br /> person installing or testing any component that is repaired or replaced. Ensure a copy of the "Site Health and Safety <br /> Plan"is available on the jobsite as required by Title 8. <br /> 3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br /> to scale showing location of repairs and/or replacements. If repairing a component, describe how this will be done. (If <br /> adding piping, UDC's, or other UST equipment, or performing tank top upgrade, use the UST Installation Application <br /> pages 4-8 as necessary for a timely plan review): <br /> Break ground to remove existing vent boots on diesel and unleaded vent lines.Install new Bravo vent transition <br /> box with veeder root sensor. <br /> 4. List of equipment to be used(Attach manufacturer's specification sheets showing third-parry approval): <br /> Bravo Single Wall Transition Box <br /> Flexing Flexible Connectors <br /> Veeder Root 208 Sensor <br /> OPW Test Boots <br /> OPW Flexible Entry Boots <br /> NOV(AO SMITH)pipe and Fittings <br /> 3 <br />