Laserfiche WebLink
0 <br /> I TAI T <br /> unxa♦o rxs cxusexos 11280 T,ode Center Drlve, Roncho Co,dovv,CA 95742 <br /> V'9161858?1090 www.tolt.com <br /> RECEIVED <br /> MAY 0 6 2015 <br /> 5/5/2015 <br /> ENVIRONMENTAL HEALTH <br /> Via: Hand Delivery PERMIT/SERVICES <br /> San Joaquin County <br /> Environmental Health Department <br /> 1868 East Hazelton Ave <br /> Stockton, CA 95205 <br /> Attn: UST Compliance DEpartment <br /> Re: Pacific Gas and Electric Company <br /> 4040 West Lane, Stockton <br /> Tait Environmental Services has been requested to perform work at the above referenced location.The scope of <br /> work will be performed as follows. <br /> TES will saw-cut and remove the asphalt around the existing UST vent stack at the south side of the truck <br /> wash area. <br /> TES will remove the above ground vent lines and protect in place. <br /> TES will excavate down to the existing 3 over 2 vent piping from the UST. <br /> TES will remove the flex lines and prepare to install the new vent box. <br /> TES will place all excavated material on plastic next to the excavation and cover for re-use. <br /> TES will set the new vent box in place. <br /> TES will make new entry points for four(4)existing fiberglass vent lines. <br /> TES will install new entry boots. <br /> TES will install V2" ridged conduit from the existing TLS-350 across the outside of the shop building and <br /> terminate at the new vent box. <br /> TES will pull in the new Beldon shielded wire and install the new 208 VR sensor. <br /> TES will reprogram the existing TLS-350 to include the new vent box sensor. <br /> TES will extend the existing fiberglass piping into the vent box. <br /> TES will schedule and stand primary pipe inspection. <br /> TES will complete the secondary fiberglass piping and install the termination boots. <br /> TES will schedule and stand secondary pipe inspection <br /> TES will schedule and stand inspection of the new vent box sensor. <br /> TES will schedule and stand lake-test of new vent box. <br /> Upon final piping inspection,TES will re-install excavated material back into the excavation. <br /> TES will back fill to 6" below finish grade. <br /> TES will pour new 3000 PSI concrete around the vent box installation and finish at existing grade. <br /> CA licd 588098 1 AZ IICN 0959841 NV hc#00496661 TX hck CR0000041 <br />