Laserfiche WebLink
SWRCB,January 2002 <br /> 5. SECONDARY PIPE TESTING <br /> "Test Method Developed By: ❑Piping Manufacturer ❑X Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: [H]Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: 4"dial gauge Equipment Resolution: .1 <br /> Unleaded Diesel Waste Oil <br /> Piping Material: fiberglass fiberglass fiberglass <br /> Piping Manufacturer: smith smith ameron <br /> Piping Diameter: 3" 3" 3" <br /> Length of Piping Run: Approx. Approx. Approx. <br /> Product Stored: Unleaded Diesel Waste Oil <br /> Method and location of Test boot Test boot Test boot <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 15min 15min 15min <br /> starting test: <br /> Test Start Time: 9:05am 9:05am 2:00pm <br /> Initial Reading(Rj): 5psi 5psi 5psi <br /> Test End Time: 10:05am 10:05am 3:00pm <br /> Final Reading(RF): 5psi 5psi 5psi <br /> Test Duration: 1 hour 1 hour 1 hour <br /> Change in Reading(RF-Ri): 0 0 0 <br /> Pass/Fail Threshold or 0 0 0 <br /> Criteria: <br /> Test Result: ❑X Pass ❑Fail 0 Pass ❑Fail ❑X Pass ❑Fail ❑Pass ❑Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> sensor was removed from testing and was put back after finish <br />