My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2005-2008
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
1250
>
2300 - Underground Storage Tank Program
>
PR0231299
>
COMPLIANCE INFO 2005-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:40:09 PM
Creation date
11/8/2018 10:00:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005-2008
RECORD_ID
PR0231299
PE
2361
FACILITY_ID
FA0003972
FACILITY_NAME
THRIFTY OIL COMPANY
STREET_NUMBER
1250
Direction
N
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
11731001
CURRENT_STATUS
02
SITE_LOCATION
1250 N WILSON WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\W\WILSON\1250\PR0231299\COMPLIANCE INFO 2005-2008.PDF
QuestysFileName
COMPLIANCE INFO 2005-2008
QuestysRecordDate
5/24/2018 4:59:31 PM
QuestysRecordID
3904191
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
357
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB. January 2002 <br /> Page 2. <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facilitv is Not Equipped With Spill/Overfill Containment Boxes: El <br /> Spill/Overfill Containment Boxes are Present. but%%ere Not Tested: El <br /> Test Method Developed By: Spill Bucket Manufacturer ❑X Industry Standard Professional Engineer <br /> ❑ Other(Specify) <br /> Test Method Used: D Pressure E] Vacuum ❑X Hydrostatic <br /> Other(Specify) . <br /> Test Equipment Used: Equipment Resolution: <br /> Spill Box p 1 REG FILL Spill Box Y 2 MID FILL Spill Box 9 3 SUP FILL Spill Box Al <br /> Bucket Diameter: 10 1/2" 10 1/211 10 1/2" <br /> Bucket Depth: 14" 14" 14" <br /> Wait time between applying <br /> pressure/vacuum/water and 5 MIN. 5 MIN. 5 MIN. <br /> starting test: <br /> Test Start Time: 9:15 9:15 9:15 <br /> Initial Reading(R[ ): 13" 11 1/2" 12" <br /> Test End Time: 10:20 10:20 10:20 <br /> Final Readin,(RP ): 13" 11 1/2" 12" <br /> Test Duration: 60 MIN. 60 MIN. 60 MIN. <br /> Change in Reading(R F - Ri ) 0" 0" 0" <br /> Pass/Fail Threshold or PASS PASS PASS <br /> Criteria: <br /> Test Result: �.Pass 1:1 Fail Pass 1:1 Fail Ifl Pass E] Fail 0 Pass 1:1 Fail <br /> Coninietlts - /Include information on repairs made prion to le.Ylin�. and)('("millold(WIolloll-up for Mlh'd Icsl.ei <br /> OPW SPILL BUCKET'S ON SITE. <br />
The URL can be used to link to this page
Your browser does not support the video tag.