Laserfiche WebLink
SWRCB. January 2002 <br /> Page 2. <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facilitv is Not Equipped With Spill/Overfill Containment Boxes: El <br /> Spill/Overfill Containment Boxes are Present. but%%ere Not Tested: El <br /> Test Method Developed By: Spill Bucket Manufacturer ❑X Industry Standard Professional Engineer <br /> ❑ Other(Specify) <br /> Test Method Used: D Pressure E] Vacuum ❑X Hydrostatic <br /> Other(Specify) . <br /> Test Equipment Used: Equipment Resolution: <br /> Spill Box p 1 REG FILL Spill Box Y 2 MID FILL Spill Box 9 3 SUP FILL Spill Box Al <br /> Bucket Diameter: 10 1/2" 10 1/211 10 1/2" <br /> Bucket Depth: 14" 14" 14" <br /> Wait time between applying <br /> pressure/vacuum/water and 5 MIN. 5 MIN. 5 MIN. <br /> starting test: <br /> Test Start Time: 9:15 9:15 9:15 <br /> Initial Reading(R[ ): 13" 11 1/2" 12" <br /> Test End Time: 10:20 10:20 10:20 <br /> Final Readin,(RP ): 13" 11 1/2" 12" <br /> Test Duration: 60 MIN. 60 MIN. 60 MIN. <br /> Change in Reading(R F - Ri ) 0" 0" 0" <br /> Pass/Fail Threshold or PASS PASS PASS <br /> Criteria: <br /> Test Result: �.Pass 1:1 Fail Pass 1:1 Fail Ifl Pass E] Fail 0 Pass 1:1 Fail <br /> Coninietlts - /Include information on repairs made prion to le.Ylin�. and)('("millold(WIolloll-up for Mlh'd Icsl.ei <br /> OPW SPILL BUCKET'S ON SITE. <br />