My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2005-2008
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
1250
>
2300 - Underground Storage Tank Program
>
PR0231299
>
COMPLIANCE INFO 2005-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:40:09 PM
Creation date
11/8/2018 10:00:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005-2008
RECORD_ID
PR0231299
PE
2361
FACILITY_ID
FA0003972
FACILITY_NAME
THRIFTY OIL COMPANY
STREET_NUMBER
1250
Direction
N
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
11731001
CURRENT_STATUS
02
SITE_LOCATION
1250 N WILSON WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\W\WILSON\1250\PR0231299\COMPLIANCE INFO 2005-2008.PDF
QuestysFileName
COMPLIANCE INFO 2005-2008
QuestysRecordDate
5/24/2018 4:59:31 PM
QuestysRecordID
3904191
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
357
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUNDSTORAGETANK <br /> MONITORING PLAN-PAGE 1 <br /> TYPE OF ACTION ® L NEW PLAN ❑ 2.CHANGE OF INFORMATION Mol <br /> PLAN TYPE ® MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. _ <br /> Mer. <br /> (Check one item only) 1-1 THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> FACILITY <br /> I. FACILITY INFORMATION <br /> ID#(Agency Use Ors[y) <br /> FACILITY NAME ARCO#09600 <br /> M03. <br /> FACILITY SITE ADDREss 1250 N.WII SON WAY MM. crrY STOCKTON Mos. <br /> II. EQUIPMENT TESTING ANp PREVENTIVE MAINTENANCE <br /> State law requires that testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,Gne leak detectors,etc.)be performed in M06. <br /> accordance with the equipment manufacturers'instructions,or amually,whichever is more frequent. Such work must be performed by quaed personnel. <br /> MONITORING EQUIPMENT is SERVICED ® 1.ANNUALLY ❑ 99.OTHER(Specify): Mm. <br /> III. MONITORING LOCATIONS <br /> This monitoring plan must include a Site Plan showing the general tank and piping layouts and the locations where monitoring is performed(i.e.,location of each sensor, <br /> line leak detector,monitoring system control panel,etc.). If you already have a diagram(e.g.,current UST Monitoring Site Plan from a Monitoring System Certification <br /> form,Hazardous Materials Business Plan mae,etc.)which shows a0 mquired information,include it with this plan. <br /> IV. TANK MONITORING <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S):(Check all that apply) MIo. <br /> ® L CONTINUOUS ELECTRONIC MONITORING OF TANK ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULTS) <br /> SECONDARY CONTAINMENT IS: ® a.DRY ❑ b.LIQUID FILLED ❑ c.UNDER PRESSURE ❑ d.UNDER VACUUM M11 <br /> PANEL MANUFACTURER: _ Veeder Root M12. MODEL#: -ILS 350 M <br /> LEAK SENSOR MANUFACTURER: Veeder Root M14. MODEL#(S): 794 380-410 MI5. <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANKS) <br /> PANEL MANUFACTURER: M16. MODEL#: Mn. <br /> IN-TANK PROBE MANUFACTURER: Mts. MODEL#(S): M19, <br /> LEAK TEST FREQUENCY: ❑ ..CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ C.WEEKLY M20. <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): M21. <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.h. ❑ b.0.2 g.p.h. ❑ c.OTHER(Specify): M22. M23. <br /> ❑ 3.INVENTORY RECONCILIATION ❑ a.MANUAL PER 23 CCR§2646 ❑ b.STATISTICAL PER 23 CCR§2646.1 M24. <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)PER 23 CCR§2645 <br /> TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS M25. <br /> ❑ 5.INTEGRITY TESTING PER 23 CCR§2643.1 <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): M26. Mgt. <br /> ❑ 6.VISUALMONLTORING DONE: ❑ a.DAILY ❑ b.WEEKLY(Rwniro.agoMyappro.at> <br /> ❑ 99.OTHER(Specify): <br /> 1028. <br /> V. PIPE MONITORING <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check a0 that apply) M30. <br /> ® 1.CONTINUOUS ELECTRONIC MONITORING OF PIPING SUMP(S)/3'RENCH(ES)AND OTHER SECONDARY CONTAINMENT <br /> SECONDARY CONTAINMENT IS: ® a.DRY ❑ b.LIQUID FILLED ❑ c.UNDER PRESSURE ❑ d.UNDER VACUUM M31. <br /> PANEL MANUFACTURER: Veeder Root M32. MODEL#: Ti. 0 M33. <br /> LEAK SENSOR MANUFACTURER: Veeder Root M34. MODEL#(S): 794380-323 Mas. <br /> WILL A PING LEAK ALARM TRIGGER AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN? ® a.YES ❑ b.NO M36. <br /> WILL FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? ® a.YES ❑ b.NO M37. <br /> ® 2.MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED <br /> MLLD MANUFACTURER(s): VAPORLESS Mas. MODEL#(S): LD2000 M39. <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS <br /> ELLD MANUFACTURER: MOI. MODEL#: Mat. <br /> PROGRAMMED LINE INTEGRITY TESTS: ❑ a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1h. M42. <br /> WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHU'T'DOWN? g P <br /> ❑ a.YES Elb.NO M43. <br /> WILL ELLD FAILURE/DISCONNECTTONIRIGGER AUTOMATIC PUMP SHU'T'DOWN? ❑ a.YES ❑ b.NO Maa. <br /> ❑ 4.INTEGRITY TESTING <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) M45. M46. <br /> ❑ 5.VISUALMONITORINGDONE: ❑ a.DAILY ❑ b.WEEKLY* ❑ C.MIN MONTHLY&EACH TIME SYSTEM OPERATED-* M47. <br /> •lo uhesawncyap,noa a•AlbwM for monitoring ofunburieJ emergency genavor fuel piping only per HSC§25291.5(6x3) <br /> ❑ 6.PIPING IS SUCTION PIPING MEETING ALL REQUIREMENTS FOR EXEMPTION FROM MONITORING PER 23 CCR§2636(a)(3) <br /> ❑ 7.NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) <br /> ❑ 99.OTHER(Specify) <br /> M48. <br /> Arco#09600,Belshire Environmental Services <br /> Page 1 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.