My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2005-2008
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
1250
>
2300 - Underground Storage Tank Program
>
PR0231299
>
COMPLIANCE INFO 2005-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:40:09 PM
Creation date
11/8/2018 10:00:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005-2008
RECORD_ID
PR0231299
PE
2361
FACILITY_ID
FA0003972
FACILITY_NAME
THRIFTY OIL COMPANY
STREET_NUMBER
1250
Direction
N
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
11731001
CURRENT_STATUS
02
SITE_LOCATION
1250 N WILSON WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\W\WILSON\1250\PR0231299\COMPLIANCE INFO 2005-2008.PDF
QuestysFileName
COMPLIANCE INFO 2005-2008
QuestysRecordDate
5/24/2018 4:59:31 PM
QuestysRecordID
3904191
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
357
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Order: 2242205 • • <br /> bp <br /> 0 <br /> MechanicaCector Test Data Sheet <br /> NO <br /> ODD HD Date20UP <br /> Address IdSD �. <br /> Test Fation <br /> 1 2 3 4 5 <br /> Product g c(f <br /> Manufacturer <br /> Model <br /> Lam- I�tfLb <br /> Full Operating Pnonaure(psi) O - <br /> t t <br /> Line Bleed Back(ml) <br /> Trip Timo(sec) <br /> Metering Pressure(psi) <br /> RE Holding Pressure(psi) a d <br /> Test Leak Rate(mtlmin)(gph) v' I l <br /> PASS or FAIL. S <br /> Comments: 1 <br /> This letter certifies that the armuc leak detect 15 were performed at the above referenced facility <br /> according to the equipment manufacturers laroo and limitations and the results as listed are to my <br /> knowledge true and correct_ The mechanical hke test pass/fail is determined using a low flow <br /> threshold trip rate of 3 gph at 10 PSI, <br /> Inspected By: Contractor -7rIVILLZI <br /> Technician / Lic# �f"p <br /> i <br /> Signal <br /> aevieian xv�i <br /> Tanknology-NDE 8900 Shoal Creek,Building 200 Austin,Texas 78757 <br />
The URL can be used to link to this page
Your browser does not support the video tag.