Laserfiche WebLink
3. Piping Leak Detection Monitorin E ui ment <br /> Monitoring Method Manufacturer Model Monitoring FTguency <br /> N Sump leak sensors connected to <br /> continuous monitoring system Veeder Root 794380-323 <br /> Specify type: Continuous <br /> ❑ Discriminating <br /> N Non-discriminating <br /> N Mechanical line leak detectors with Vapodess LD2000 <br /> programmed leak threshold of three Every pumping cycle <br /> gallons per hour <br /> ❑ Electronic line leak detectors with <br /> programmed leak threshold of: Every pumping cycle <br /> ❑0.1 gph ❑0.2 qph ❑3 gph <br /> ® Line integrity testing by: <br /> ❑ Electronic line leak detector is <br /> equipped to conduct line tightness ❑Annually <br /> testing ❑Other: <br /> ❑Third party testing <br /> N Notrequired <br /> ❑ Other(Specify): <br /> 4. Dispenser Leak Detection Monitoring Equipment <br /> Monitoring Method Manufacturer Model Monitoring Frequency <br /> ❑ Mechanical float in dispenser Continuous <br /> containment <br /> N Electronic leak sensor in dispenser <br /> containment: Veeder Root 794380-323 Continuous <br /> ❑ Discriminating <br /> N Non-discriminating <br /> El Visual inspection El Daily <br /> ❑Other: <br /> ❑ No under-dispenser containment <br /> ❑Other(specify): <br /> 5. Positive Shutdown Capabilities <br /> ❑System does not have positive shutdown capabilities <br /> ❑ Individual dispenser shutdown will occur whenever release is sensed in under-dispenser containment <br /> N Automatic pump shut off will occur whenever: <br /> N Release is sensed in turbine sump <br /> N Release is sensed in primary piping <br /> N Release is sensed at dispenser <br /> N Monitoring system is disconnected or fails in any way(fail safe) <br /> ❑Other(specify): <br /> 6.Secondary Containment Testing <br /> ❑Secondary containment is not tested <br /> N In the State of California, secondary containment systems installed on or after January 1,2001,shall be tested upon installation, <br /> six months after installation,and every 36 months thereafter. Secondary containment systems installed prior to January 1,2001, <br /> shall be tested by January 1,2003,and every 36 months thereafter. <br /> 7. Annual Equipment CertificationITestin <br /> Annually <br /> ❑Other(specify): <br /> 2 <br />