Laserfiche WebLink
Page of <br /> 7. tOER-DISPENSER CONTAINMENT(UO)TESTING <br /> Test Method Developed By: UDC Manufacturer ❑ Industry Standard ® Professional Engineer ❑ <br /> Other(Specify) <br /> Test Method Used: Pressure ❑ Vacuum ❑ Hydrostatic <br /> Other(Specify) <br /> Test Equipment Used: Wayne Perry Inc. See Attached Testing Results Equipment Resolution: .00007 <br /> Under-Dispenser Containment Number Below <br /> UDC Manufacturer: t <br /> UDC Material: <br /> UDC Depth: <br /> Height from UDC Bottom to Top <br /> of Highest Piping Penetration: illl A� <br /> Height from UDC Bottom to <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to <br /> testing: i <br /> Portion of UDC Tested' 2°Above Highest 2"Above Highest 2"Above Highest 2"Above Highest <br /> Penetration Penetration Penetration Penetration <br /> Does turbine shut down when ❑Yes❑ No NA® ❑ Yes❑ No NA® ❑Yes❑ No NA® ❑Yes❑ No NA® <br /> UDC sensor detects liquid. <br /> Turbine shutdown response time ❑ Yes❑ No NA® ❑Yes❑ No NA® ❑ Yes❑ No NA® ❑Yes❑ No NA® <br /> Is system programmed for fail- <br /> safe shutdown?. [IYes❑ No NAM ❑Yes❑ No NAM [3Yes❑ No NAM [IYes[INo NA® <br /> Was fail-safe verified to be ❑ Yes❑ No NA® ❑Yes❑ No NA® ❑Yes❑ No NAM ❑Yes❑ No NA® <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and 15 Minutes 15 Minutes 15 Minutes 15 Minutes <br /> starting test <br /> Test Start Time: <br /> Initial Reading(RI): y71 tfy Ivjz92 <br /> Test End Time: Z : 2 Z, /( <br /> Final Reading(RF): <br /> Test Duration: 15 Min 15 Min 15 Min 15 Min 15 Min 15 Min 15 Min 15 Min <br /> Change in Reading(RF-RD: 214-Op_45— <br /> Pass/Fail <br /> JPass/Fail Threshold or Criteria: -0.0020 -0.0020 -0.0020 -0.0020 -0.0020 -0.0020 -0.0020 -0.0020 <br /> Test Result: [g Pass V Pass ❑ Pass ❑ Pass ❑ Pass ❑ Pass ❑ Pass ❑ Pass <br /> ❑ Fail 1 ❑ Fail ❑ Fail I ❑ Fail ❑ Fail ❑ Fail ❑Fail 1 ❑, Fail <br /> Was sensor removed for testing? ❑ Yes❑ No NA❑ ❑Yes❑ No NAE] ❑ Yes❑ No NA❑ ❑ Yes❑ No NA❑ <br /> Was sensor properly replaced and ❑ Yes❑ No NAE] ❑ Yes❑ No NAE] ❑Yes❑ No NAE] ❑ Yes❑ No NAE] <br /> verified functional after testing? <br /> Comments—(include information on repairs made prior to testing, and recommended fallow-up forfailed tests) <br /> Arco #9600 <br /> 1250 N Wilson Way <br /> Stockton, CA. 95205 <br /> N05114 — SB 989 Testing <br />