Laserfiche WebLink
• • Page of <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested ❑ <br /> Test Method Developed By: ❑Spill Bucket Manufacturer ®Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure ❑Vacuum ®Hydrostatic <br /> ❑ Other(Specify) <br /> Test Equipment Used:Wayne Perry Inc. See Attached Results Equipment Resolution:.0007 <br /> Spill/Overfill Containment Box Number <br /> r 7V I/ <br /> Bucket Diameter: / <br /> Bucket Depth: <br /> Wait time between applying <br /> pressure/vacuum/water and 15 Minutes 15 Minutes 15 Minutes 15 Minutes 15 Minutes 15 Minutes 15 Minutes 15 Minutes <br /> starting test: <br /> Test Start Time: 1/,'3 7 /G,"/(> /O <br /> Initial Reading(RD: '3-71i If, f jY FO O f'6 #ee VY 1167J9r <br /> Test End Time: j/. s j //.'..SZ <br /> Final Reading(RF): 1-30 <br /> Test <br /> Test Duration: <br /> Change inReading(RFR,): o—va ,a-P Yf <br /> Pass/Fail Threshold or -0.0020 -0.0020 -0.0020 -0.0020 -0.0020 -0.0020 -0.0020 -0.0020 <br /> Criteria: <br /> Test Result: I3 Pass ❑ Pass K Pass'' JA Pass 9 Pass--- 67— <br /> Pass ❑ Pass ❑ Pass <br /> Fail ❑ Fail ❑ Fail ❑ Fail ❑ Fail ❑ Fail ❑ Fail ❑ Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> Arco #9600 <br /> 1250 N Wilson Way <br /> Stockton, CA. 95205 <br /> N05114 — SB 989 Testing <br />