Laserfiche WebLink
0 0 <br /> INDIVIDUAL TANK INFORMATION AND TEST RESULTS <br /> Jiâ–ºTanknology <br /> TEST DATE: 03/26/08 8501 N MOPAC EXPRESSWAY,SUITE 400 WORK ORDER NUMBER: 2255433 <br /> AUSTIN,TEXAS 78759(512)451-6334 <br /> CLIENT: BP PRODUCTS NORTH SITE: ARCO # 09600, CC 18022603 <br /> TANK INFORMATION <br /> Tank ID: 2 Tank manifolded: NO Bottom to top fill in inches: 120.0 <br /> Product: MIDGRADE Vent manifolded: NO Bottom to grade in inches: <br /> Capacity in gallons: 12,044 Vapor recovery manifolded: YES Fill pipe length in inches: <br /> Diameter in inches: 120.00 Overfill protection: YES Fill pipe diameter in inches: <br /> Length in inches: 249 Overspill protection: YES Stage l vapor recovery: DUAL <br /> Material: DW STEEL Installed: ATG Stage II vapor recovery: BALANCE <br /> CP installed on: / / <br /> COMMENTS <br /> TANK TEST RESULTS Test Method: LEAK DETECTOR TEST RESULTS Test method <br /> PSI at tank bottom: New/passed Failed/replaced New/passed Failed/replaced <br /> Fluid level in inches: L.D.#1 L.D.#1 L.D.#2 L.D.#2 <br /> UFT/OFT: Make: VAPORLESS <br /> Fluid volume in gallons: Model: LD2000 <br /> Tank water level in inches: SIN: oar ew <br /> Test time: NOT Open time in sec: 3.00 <br /> Number ofthermisters: TESTED Holding psi: 34 NOT <br /> Specific gravity: Resiliency cc: 150 TESTED <br /> Water table depth in inches: Test leak rate ml/m: 189.0 <br /> Determined by(method): Metering psi: 19 <br /> Leak rate in gph: Calib. leak in gph: 3.00 <br /> Result: Results: PASS <br /> COMMENTS COMMENTS <br /> 'I,,. E1 "ESULTSTesf Method LINE TEST RESULTS Test type: <br /> Test time: Material: DW FIBERG <br /> Ullage volume: Diameter(in): <br /> Ullage pressure: Length(ft): <br /> Results: Test psi: <br /> Bleedback cc: <br /> DATA FOR UTS-4T ONLY: Test time(min):Test 1:Start time: <br /> Time Of test 1: Finish psi: NOT NOT NOT NOT <br /> Temperature: NOT Vol change cc: TESTED TESTED TESTED TESTED <br /> : TESTED <br /> Flow rate cff Test 2:start time: <br /> ( ) Finish psi: <br /> Time of test 2: Vol change cc: <br /> Test 3:Start time: <br /> Temperature: Finish psi: <br /> Flow rate(cfh): Vol change cc: <br /> Time of test 3: Final gph: <br /> Temperature: Result: <br /> Flow rate(cfh): Pump type: PRESSURE <br /> COMMENTS Pump make: RED JACKET <br /> COMMENTS Impact Valves Operational: YES <br /> Printed 04/01/200813:16 KOHLMEYER <br />