Laserfiche WebLink
Work Order: I 2255433 to 0 <br /> bp) <br /> 10l Emergency Stop (E-Stop) Testing Results I Checklist <br /> — <br /> FadJ-4019rs.Ib�- <br /> .Ol i6 M— <br /> _TESTRq <br /> I <br /> te AI Cu,NaBMW <br /> Ad on .. Phone 9 <br /> City!St: <br /> LeadTeUfrnuaPASS <br /> .MainI-L Wmo.9 Name: or <br /> elute: F7 <br /> FAIL( "t Day Repair Re lured) <br /> The 001W11.of Ill Int IS 16 l assurance that he when the EZIl ll is activated,all The.Jushng systemcirwit,fbilbillel,•and dimp.rSerli are de- <br /> r <br /> eaqlUm and remain deminhegized untilz an re-set Manually]. The feet)MCedures and tiviWlinot all be in ac=vdal with the Eml Tq*t-nQ Process. <br /> # Tho fW10,`0119 Mrwa`allon is fi,be cOmpfamem X T.i <br /> Y..T—N.7N—?A <br /> SITE DATA <br /> Numm.-or E-Eitop sanicrjai- L <br /> _Momentary ril­ Other ".1 atmt <br /> MCITIMIary, fight!Toggle <br /> TK6rintary type,locate�and <br /> denfifyiemsel button); <br /> 3 Ty—pe of Tul—Control Relay System(Elautrical D Istribul ion <br /> finown.BOX <br /> _Powur S;5ulionher �—.Mom Fa <br /> 0 bricqted <br /> 4 Type nf TurbineControl Relays: M Model <br /> 5 Type DfUrle—Leak Del chal ELD/l PLL.D <br /> — <br /> 6 Does the E-Slop qhLrIdGVM power to be DISPENSERS <br /> �7 50-es—111dEmStopsh-Utdown power lothe TURBINES <br /> e Is the 220 voltage to the turnill�IaYre�ed�(bathskif—w—Qftherelay)—v'—m <br /> TURBINE Bl--- jal— <br /> ERS eleody Identified I Is: a ad <br /> I G D d ft E-St l fur ion correctly(d e-eril lzed front both sides of the relay) <br /> -13A Tfill�NO,briefly ciescrjbeWoncr. <br /> INI-How—wasil corrected: <br /> IOC -f repair u:TEStop"Juvril all ly can l be corrected linne—day(pWW-to Il The techiilldllrl—MUST r7r,—tjfiprj <br /> 'tie Site Manager ofthe problem,place a,"Out D(Service—aq on the E-StOP(s).and Identified an altemate invar!V <br /> site shuldo.9n in the even[ nn cinergency. <br /> I al The I I�w Customer soIjti6l—Cen to r nes been— cltedlo,rhe repair. -- <br /> Ticket# <br /> PQST:FmeST <br /> 3l <br /> IN <br /> 11 Site's Ill system is ILdly Operational, <br /> 12 All equipment secured and any access ports, <br /> Gds,enclosure:we dosed. <br /> AI:safetybarr—jcades,and—anydebril been lmowd <br /> FPRJ�Fn <br /> Tanknology Inc. 8501 N. MoPac Expressway,Suite 400,Austin,Texas 78759 <br />