My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2005-2008
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
1250
>
2300 - Underground Storage Tank Program
>
PR0231299
>
COMPLIANCE INFO 2005-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:40:09 PM
Creation date
11/8/2018 10:00:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005-2008
RECORD_ID
PR0231299
PE
2361
FACILITY_ID
FA0003972
FACILITY_NAME
THRIFTY OIL COMPANY
STREET_NUMBER
1250
Direction
N
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
11731001
CURRENT_STATUS
02
SITE_LOCATION
1250 N WILSON WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\W\WILSON\1250\PR0231299\COMPLIANCE INFO 2005-2008.PDF
QuestysFileName
COMPLIANCE INFO 2005-2008
QuestysRecordDate
5/24/2018 4:59:31 PM
QuestysRecordID
3904191
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
357
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IED PROGRAM CONSOLIDATED FO <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN - (Page 1 of 3) <br /> TYPE OF ACTION ® I.NEW PLAN ❑ 2.CHANGE OF INFORMATION 490-1. <br /> PLAN TYPE ® 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 490-2. <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): 490-2-3 <br /> L FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) <br /> BUSINESS NAME(Same as Facility Name or DBA) ARCO 09600 3. <br /> Bus]NEss SITE ADDRESS 1250 N WILSON WAY 103 BuslNEss SITE c]ry STOCKTON 104. <br /> II. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc)must be performed at the frequency specified <br /> by the equipment manufacturers instructions,or annually,whichever is more frequent Such work must be peBormed by qualified personnel [23 CCR§2632 2e34,2638,26411 <br /> MONITORING EQUIPMENT IS SERVICED I.ANNUALLY ❑ 99.OTHER(Specify): 490.3-3. <br /> 49°-36_ <br /> III. MONITORING LOCATIONS <br /> ® 1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN ❑ 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED [23 CCR§2632,2634] 4904 <br /> IV. TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) t a r) <br /> ® 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) 490-5. <br /> WITH AUDIBLE AND VISUAL ALARMS.[23 CCR§2632,2634) <br /> SECONDARY CONTAINMENT IS: ® a DRY ❑ In LIQUID FILLED ❑ c.PRESSURIZED ❑ d.UNDER VACUUM 49°-6. <br /> PANEL MANUFACTURER: VeedeP Root 490.7' MODEL#: TLS-350 490-8. <br /> LEAK SENSOR MANUFACTURER: VeedeP Root 490-9. MODEL#(S): 794390-420 490.10' <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S).[23 cCR§2643] 4904 L <br /> PANEL MANUFACTURER: 490-12. MODEL#: 490-13. <br /> IN-TANK PROBE MANUFACTURER: 490-14. MODEL#(S): 490-15. <br /> LEAK TEST FREQUENCY: ❑ a CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY 490-16. <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): 490-17. <br /> MED TESTS: <br /> PROGRAM ❑ a 0.1 49NIS <br /> _-_-- g.p.h. ❑ 6:..02 g.p.h. _❑ c_OTI-IER(Specify): 490-19. <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION[23 cca gz646.17 49-320. <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)In CCR§2645] _ TESTING PERIOD: ❑ a.36 HOURS ❑ In 60 HOURS <90°u 21. <br /> ❑ 5.TANK INTEGRITY TESTING PER[23 CCR§2643.11 490-23. <br /> TEST FRE UENCY: El a.ANNUALLY b. El c.BIENNIALLY OTHER(Specify): 49(nN. <br /> Q ( P $') 49-325. <br /> ❑ 99.OTHER(Specify): - 490-26. <br /> 490-2T <br /> V. PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) paha[) <br /> ® 1.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE&VISUAL ALARMS. 490-29. <br /> §26 6] SECONDARY CONTAINMENT IS: ❑ a.DRY El b.LIQUID FILLED E] c.PRESSURIZED [Id.UNDER VACUUM 490-29' <br /> PANEL MANUFACTURER:VeedeP Root 490-30. MODEL#: TLS-350 49°-3'. <br /> LEAK SENSOR MANUFACTURER: Veeder Root 490-32MODEL#(S): 794380-323 490-33. <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. ® a YES ❑ In NO 490-34. <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. Z a.YES ❑ b.NO 49°-35. <br /> 0-2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF 49036. <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED.[23 CCR§26361 <br /> __MELD MANUFACTURER(S): eedef Root 490-37. MODEL#(s): LD2000 490-38. <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS.[23 CCR§2636] 490-39. <br /> ELLD MANUFACTURER(S): 49040 MODEL#(S): 490-41' <br /> PROGRAMMED IN LINE LEAK TEST: ❑ a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1 g.p.h. 490A2. <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑ b.NO 410.43. <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a YES ❑ b.NO 494- . <br /> ❑ 4.PIPE INTEGRITY TESTING. - ---�-- -- 49045. <br /> 046 <br /> ____ TEST FREQUENCY: _ Ela._ANNUALLY _Elb.EVERY 3 YEARS ❑ c.OTHER(Specify) 49 47, <br /> ❑ 5.VISUAL PIPE MONITORING. 49048. <br /> FREQUENCY: - ❑ a.DAILY ❑ b.WEEKLY ❑ c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED- 49049. <br /> •elllowed form=tmivgvfunlmcd emagev Ygnaator fuel pipivg o± per HSC25281:N)(3) <br /> El 6.SUCTION PIPING MEETS EXEMPTION CRITERIA.[23 CCR§2636(a)(3)7 490-50_ <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6-7 IS CONNECTED TO THE TANK SYSTEM. 490-51. <br /> El 99.OTHER(Specify) 490-52.- <br /> 490-53. <br />
The URL can be used to link to this page
Your browser does not support the video tag.