Laserfiche WebLink
FIED PROGRAM CONSOLIDATED F <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN - (Page 1 of 3) <br /> TYPE OF ACTION ® 1.NEW PLAN [12.CHANGE OF INFORMATION 49x1. <br /> PLAN TYPE ® 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 490-2_ <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): 49-2.. <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) 1 <br /> BUSINESS NAME(Same as Facility Name or DBA) ARCO 09600 3 <br /> BUSINESS SITE ADDRESS 1250 N WILSON WAY STOCKTON 103. BUSINESS SITE CITY 104. <br /> IL EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency specified <br /> _by the equment manufacturers mstmctions or annually,whichever is more freq_uent._Such work must be performed by qualified personnel.[23 CCR§2632,2634,2638,2641]__ <br /> MONITORING EQUIPMENT IS SERVICED ® 1.ANNUALLY ❑ 99 OTHER(Specify): 490-3b. <br /> III. MONITORING LOCATIONS <br /> ® L NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN ❑ 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED [23 CCR§2632,2634] 4904, <br /> IV. TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) teakly) <br /> ® 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) 490-5. <br /> WITH AUDIBLE AND VISUAL ALARMS.[23 CCR§2632,26341 <br /> SECONDARY CONTAINMENT IS: ® a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑ it.UNDER VACUUM 490-6. <br /> PANEL MANUFACTURER: Veeder Root 490-. MODEL#: TLS-350 490-8. <br /> LEAK SENSOR MANUFACTURER: Veeder Root 490-9. MODEL#(S): 794390-420 490-10. <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S).[23 CCR§2643] 49-°. <br /> PANEL MANUFACTURER: 490-12. MODEL#: 49-13. <br /> IN-TANK PROBE MANUFACTURER: 49x14. MODEL#(S): 49015. <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY 490-16. <br /> ❑ d.MONTHLY ❑ e.OTHERS eci 490-1z <br /> ( P fY) <br /> 49x18. <br /> ....................PROGRAMMED TESTS:...........-.-.-..❑ a_0 I g_P_h-__ _..______- b_0.2 g_p.h._ _........-❑_c_OTHER(Specify): _ 49x19. <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION[23 CCR§2646.1] 490-zo. <br /> 9999_. ..9999___ __----___ _________ ___________ ____ _____.._- ____...... <br /> ❑ 4 WEEKLY MANUAL TANK GAUGING(MTG)123 CCR§2645I TESTING PERIOD: ❑ it.36 HOURS ❑ b.60 HOURS490-21. <br /> __________ 49022,__... <br /> ❑ 5.TANK INTEGRITY TESTING PER 12 CCR§2643.11 490-23 <br /> 490-24 <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b BIENNIALLY [I c.OTHER(Specify): 490-25 <br /> ....... ............. ... ......_._. ......._. ........'" 49026_.. <br /> ❑ 99.OTHER(Specify): 4W-27 <br /> 11 <br /> V. PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) <br /> (Check 1 <br /> ® L CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE&VISUAL ALARMS. 491-11. <br /> 123 CCR SECONDARY CONTAINMENT IS: ® a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑ d.UNDER VACUUM 490-29. <br /> §2636] <br /> PANEL MANUFACTURER:Veeder Root 490-30, MODEL#: TLS-350 49x31. <br /> LEAK SENSOR MANUFACTURER: Veeder Root 490-32. MODEL#(S): 794380-323 490-33, <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. ® a.YES. ❑ b.NO 490-14. <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES ❑ b.NO 490-35. <br /> ................._______.___ ......_____............_-__ ____.....________.._........ <br /> ® 2.MECHANICAL LINE LEAK DETECTOR(MELD)THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS-AND RESTRICTS OR SHUTS OFF 490-36. <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED.[23 CCR§26361 <br /> MLLD MANUFACTURER(S):Veeder Root 49o-3z MODEL#(s): LD2000 4-9-0---3-8- <br /> - - - <br /> __.........._______.._._...._ . ___9999_. <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THATROUTINELYPERFORMS 3.0 g.p.h.LEAK TESTS.[23 CCR§26361 490-39. <br /> ELLD MANUFACTURER(S): <br /> 49040. MODEL#(S): 49041. <br /> PROGRAMMED IN LINE LEAK TEST: ❑ a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1 g.p.h. 49042. <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑ b.NO 490-43. <br /> ELLD FAILUREIDISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES [-] b.NO 490-44 <br /> 9045._ <br /> ❑ 4.PIPE INTEGRITY TESTING. 49045. <br /> _ TEST FREQUENCY: _0_a.ANNUALLY .❑ -b- <br /> b_EVERY 3 YEARS -❑_c_OTHER <br /> .(Specify) a9o40i46_ <br /> 9999__ .. _________ .._ ------ <br /> ___ _ ___ <br /> ❑ 5.VISUAL PIPE MONITORING. 49048. <br /> FREQUENCY: ❑ a.DAILY ❑ b.WEEKLY ❑ e.MIN.MONTHLY&EACH TIME SYSTEM OPERATED' 49049. <br /> .9999__ ____ ___.-------------- <br /> __Allowed for moniroringof unburied emergency geoammr fuel piping only pa HSC I252815(b)(3) 9999 <br /> ❑ 6. <br /> 490-50 <br /> SUCTION PIPING MEETS EXEMPTION CRITERIA [23 CCR§2636(e%3H <br /> __ ___ _________......______-.___ <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM. 49x51. <br /> 49o-sz. <br /> ❑ 99.OTHER(Specify) 490-53. <br />