My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2005-2008
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
1250
>
2300 - Underground Storage Tank Program
>
PR0231299
>
COMPLIANCE INFO 2005-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:40:09 PM
Creation date
11/8/2018 10:00:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005-2008
RECORD_ID
PR0231299
PE
2361
FACILITY_ID
FA0003972
FACILITY_NAME
THRIFTY OIL COMPANY
STREET_NUMBER
1250
Direction
N
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
11731001
CURRENT_STATUS
02
SITE_LOCATION
1250 N WILSON WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\W\WILSON\1250\PR0231299\COMPLIANCE INFO 2005-2008.PDF
QuestysFileName
COMPLIANCE INFO 2005-2008
QuestysRecordDate
5/24/2018 4:59:31 PM
QuestysRecordID
3904191
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
357
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. PIPING SUMP TESTING <br /> Test Method Developed By: ❑ Sump Manufacturer ® Industry Standard ❑ Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑ Pressure ❑ Vacuum ®Hydrostatic <br /> ❑ Other(Spec) <br /> Test Equipment Used: Incon Sump T11 - ester Equipment Resolution: +/-0.002" <br /> e °.ta'3kw .'tv 4 hr M;;; sNery a�.+•r.. ,..'rm�;�es c» asp. ' u. a..r,s , .a!xrea•-sem , <br /> 5� <br /> STPSump# <br /> I,i, ti� STPSump4 �bG1 STPSump# G� STPSump#p <br /> Sump Diameter: -,W n 4�° <br /> Sump Depth: �� s4 ,h -E54/d <br /> Sump Material: __V__ <br /> Height from Tank Top to Top of <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest <br /> Electrical Penetration: <br /> Condition of sump prior to testing: t." <br /> Portion of Sump Tested <br /> Does turbine shut down when <br /> —/ <br /> sump sensor detects liquid(both ❑ Yes❑No 2 NA ❑ Yes❑No D-N/A ❑ Yes El No 9 NA El Yes❑No ❑NA <br /> roduct and water)?� <br /> Turbine shutdown response time N a <br /> Is system programmed for fail-safe f <br /> shutdown?* ❑ Yes❑No WNA ❑ Yes❑No 'A ❑Yes❑ No ❑ Yes❑ No ❑NA <br /> Was fail-safe verified to be <br /> o erational?' ❑ Yes❑No NA ❑ Yes❑No NA ❑Yes❑No NA ❑ Yes❑ No ❑NA <br /> Wait time between applying <br /> pressure/vacuum/water and starting 30 minutes 30 minutes 30 minutes 30 minutes <br /> test: <br /> Test Start Time: 1.21 12A2 124=6 1242 j2.1$ }z qa <br /> Initial Reading(Ri): t}.�v14 1. H2 Z.40�} -2 <br /> Test End Time: 12 t � 12i• 1'1�n, j 2�' <br /> Final Reading(110: 'r-, :Z.4,52�?. 7-ags1 3.� a 3.9F� Fq <br /> Test Duration: I-�M1N j „I�r, I(pMtN I�M�n1 j•5M1� <br /> Change in Reading(RF-R,): 073, oV47 .Oooj ,66D1 .o DO <br /> Pass/Fail Threshold or Criteria: +/-0.00 +/-0.002" <br /> Test Result: Pass Fail Pass ❑Fail Pass ❑Fail ❑ Pass ❑Fail <br /> Was sensor removed for testing? Yes❑No ❑NA — Yes❑No [INA Yes❑No ❑NA ❑ Yes❑No ❑NA <br /> Was sensor properly replaced and <br /> verified Functional after testing? Yes❑ No ElNA Ishes❑ No ElNA Yes❑No❑NA ❑Yes❑No ❑NA <br /> Comments- (include information on repairs made prior io testing and recommended follow-up for failed tests) <br /> r -ra�, � <br /> If the entire depth of the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*) is"NO"or"NA", the entire sump must be tested. (See SWRCB LO-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.