My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1986-2004
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
1756
>
2300 - Underground Storage Tank Program
>
PR0231300
>
COMPLIANCE INFO 1986-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2019 11:51:24 AM
Creation date
11/8/2018 10:00:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-2004
RECORD_ID
PR0231300
PE
2361
FACILITY_ID
FA0001858
FACILITY_NAME
MY MINI MART
STREET_NUMBER
1756
Direction
N
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
11721005
CURRENT_STATUS
01
SITE_LOCATION
1756 N WILSON WAY
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\W\WILSON\1756\PR0231300\COMPLIANCE INFO 1986-2004.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
237
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WRIT'I' N MONITORING PROCEDURES <br /> UNDERGROUND STORAGE TANK MONITORING PROGRAM <br /> This monitoring program must be kept at the UST location at all times. The information on this monitoring <br /> program are conditions of the operating permit The permit holder must notify San Joaquin County <br /> Environmental Health Division.phone (209) 468-3420 within 30 days of any changes to the monitoring <br /> procedures, units required to obtain approval before making the change. <br /> Regnked by Sections 2632(d) and 2641(h) CCR- <br /> Facility <br /> CRFacility Name /yl v I"1 ;.n , M r r-�i <br /> Facility Address I I' 2 N 'W,JJ6 4 W ,� Tt�r `I-01 , (A • <br /> A. Describe the frequency of performing the mo toring: n <br /> Tank 0 . to t' ��t rr�' l M/ /,t un <br /> s <br /> Piping <br /> B. What methods and equipment, identified by name and model, will be used for <br /> performing the mo4mring: <br /> Tank LcL� eJ)'I' <br /> Pipings <br /> C. Describe the location(s) where the monitoring will be performed (facility plot plan <br /> should be attached): <br /> Pny M �✓ <br /> 75-( N ul J1J I TV V I U N (o <br /> D. List the name(s) and dde(s) of the people responsible for performing the monitoring <br /> and/or maintaining the eq}uyment: <br /> n v c, ti ,.. <br /> t <br /> � <br /> F. Describe the preventive maintenance schedule for the monitoring equipment. Note: <br /> Maintenance must be is accordance with the manufacturers' maintenance schedule <br /> but not less than every 12 months: — L�LI cti✓ <br /> G. Describe the training necessary for the operation of UST system, including piping, <br /> l <br /> and Ithe 'T'k� <br /> ' monitoring equipment: t u e e4o�-.. s-Ft� �c�� c �irJ� <br /> O� C ') <br /> - W�41 � <br />
The URL can be used to link to this page
Your browser does not support the video tag.