My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1986-2004
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
1756
>
2300 - Underground Storage Tank Program
>
PR0231300
>
COMPLIANCE INFO 1986-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2019 11:51:24 AM
Creation date
11/8/2018 10:00:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-2004
RECORD_ID
PR0231300
PE
2361
FACILITY_ID
FA0001858
FACILITY_NAME
MY MINI MART
STREET_NUMBER
1756
Direction
N
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
11721005
CURRENT_STATUS
01
SITE_LOCATION
1756 N WILSON WAY
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\W\WILSON\1756\PR0231300\COMPLIANCE INFO 1986-2004.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
237
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.-k witcring System Certification • <br /> Date of testing/Servicing: I IOL! <br /> Site Address:�y <br /> F. In-Tank Gauging! SIR Equipment: Teck this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform Icak detection monitoring. <br /> Complete the following checklist: <br /> ❑ Yes ❑ No* Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br /> ❑ Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ Yes ❑ No* Was accuracy of system product level readings tested? <br /> ❑ Yes ❑ No* Was accuracy of system water level readings tested? <br /> Cl Yes ❑ No* Were all probes reinstalled properly? <br /> ❑ Yes ❑ No* I Were all items on the equipment manufacturer's maintenance checklist completed? <br /> " In the Section H, below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> Yes ❑ No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br /> EIN/A (Check all that apply) Simulated leak rate: 3-3 g.p.h.; Ll0.1 g.p.h ; ❑ 0.2 g.p.h. <br /> Yes ❑ No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> Yes ❑ No* Was the testing apparatus properly calibrated? <br /> alVes ❑ No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ElN/A <br /> ❑ Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br /> ❑ Yes ❑ No* For electronic LLDs, does tite turbine nutomatically shut off if any portion of the monitoring system is disabled <br /> &-OA or disconnected? <br /> ❑ Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system <br /> p� /A malfunctions or fails a test? <br /> ❑ Yes ❑ o* For electronic LLDs, have all accessible wiring connections been visually inspected? <br /> l3 N/A <br /> Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In the Section H, below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> r <br /> Page 3 of 3 05100 <br />
The URL can be used to link to this page
Your browser does not support the video tag.