Laserfiche WebLink
kEtEIVEL) <br /> SWRCB,January 2002 JUN 29 2015 Pageof <br /> 4. TANK ANNULAR TESTING <br /> Test Method Developed By: X Tank Manufacturer L Industry Sta- r_ _n,r,� _ wo ngineer <br /> I Other(Specify) <br /> Test Method Used: Pressure X Vacuum ❑Hydrostatic <br /> Other(Sped) <br /> Test Equipment Used: Gast Vacuum Pump/Vacuum Gauge in Hg. Equipment Resolution: - ''/z"x-30"Hg. <br /> ,f <br /> Tank# 1&2 Tank# Tank# Tank# <br /> hTan lc Exempt From Testing?' No <br /> Tank Capacity: 12K split 9/3 <br /> Tank Material: Glass/Steel <br /> Tank Manufacturer: Jeer <br /> Product Stored: Regular 87/Super 91 <br /> Wait time between applying 30 Minutes <br /> vacuum and starting test: <br /> Test Start Time: 9:10 <br /> Initial Reading(R,): -10 Hg. <br /> Test End Time: 10:10 <br /> Final Reading(Rr): -10 Hg. <br /> Test Duration: 1 Hour <br /> Change in Reading(R,-R,): 0 Hg. <br /> Pass/Fail Threshold or Criteria: No Loss in Hg. <br /> Test Result: Pass <br /> Was sensor removed for testing? Yes <br /> Was sensor properly replaced and <br /> verified functional after testing? <br /> Yes <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> 12K Split Compartment Tank, 9k 87, 3K 91. Single Annularl <br /> Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary <br /> containment,such as systems that are hydrostatically monitored or under constant vacuum,are exempt from periodic containment <br /> testing. {California Code of Regulations,Title 23, Section 2637(a)(6)) <br />