Laserfiche WebLink
• *RECEIVED <br /> D. Results of Testing/Servicing JUL .112014 <br /> Software Version Installed: 1.11 u <br /> I fl <br /> Com let,the f1owin checklist: <br /> ® Yes ❑ No` Is the audible alarm operational? <br /> F,e ❑ No' Is the visual alarm operational? <br /> ❑ No' Were all sensors visually inspected,functionally tested,and confirmed operational?❑ No' Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with their properoperation?❑ No' If alarms are relayed to a remote monitoring station,is all communications equipment(e.g.,modem)operational?N/A <br /> ❑ No` For pressurized piping systems,does the turbine automatically shut down if the piping secondary containment monitoring system detects a❑ N/A leak, fails to operate, or is electrically disconnected? If yes: -which sensors initiate positive shut-down? (Check all that apply)Sump/Trench Sensors; ❑Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection? ®Yes; ❑No. <br /> ❑ No' For tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e.,no mechanical overfill prevention valve is <br /> ® N/A installed), is the overfill warning alarm visible and audible at the tank fill point(s) and operating property? If so,at whet percent of tank <br /> capacity does the alarm bigger? g <br /> ❑ Yes' ® No Was arae end monitoring <br /> equipment rep replaced?n if yes identify specific <br /> ecific sensors, probes, or other equipment replaced and list the manufacturer <br /> odel <br /> ent <br /> Secti <br /> ❑ Yes' ® No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br /> ❑Product; []Water. If yes,describe causes in Section E,below. <br /> ® Yes ❑ No' Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports,6 applicable <br /> ® Yes ❑ No' I Is all monitoring equipment operational per manufacturer's specifications? <br /> •In Section E below,describe how and when these deficiencies were or will be corrected. <br /> AUDIBLE ALARM STARTED WORKIMG AFTER WE DID POWER OUT SO WE TESTED ALL <br /> E. comments: SENSORS AGAIN AND PASSED. JEFF WONG ON SITE ALL PASSED. <br /> Pa e 2 of 4 2/21/07 <br /> Monitoring System Certification 9 <br />