Laserfiche WebLink
Piping (cross-sectional diagram, including connections to tank and dispensers). <br /> (A) Vent and tank riser primary containment system equipped with overfill prevention system that: <br /> _✓ Restricts delivery of flow to tank [Section 2635 (b) (2) (B) or (C)], or <br /> Provide positive shut off of flow to the tank at no more than 95 % [Section 2635 (b)(2)(01, or <br /> (B) ✓ Vapor recovery piping designed so it cannot contain liquid phase product, or <br /> (C) Suction piping (below grade piping operates at less than atmospheric pressure) [Section 2636 (a) (3)] <br /> Sloped so contents of the pipe will drain back into the storage tank if the suction is <br /> released. <br /> No valves or pumps installed below grade. <br /> V Inspection method provided to demonstrate compliance with section 2636 (a) (3). <br /> (D) ✓ Corrodible underground piping protected against corrosion (Section 2636 (b)). <br /> (E) Underground primary piping will meet all of the following requirements <br /> _ Primary piping in contact with hazardous substance under normal operation conditions shall be: <br /> installed inside a secondary containvnent system in the form of: secondary pipe_Vault or <br /> _lined trench to be sloped to a collection sump at the low point of the piping. <br /> _✓ Primary piping and secondary containment systems will be installed in accordance with industry <br /> code of practice and voluntary consensus standards.. <br /> Lined trench used as secondary contairime nt <br /> V� Material compatible with the substance stored. <br /> V" Covered and capable of supporting any expected vehicular traffic. <br /> (F) Underground piping with secondary containment will be equipped and monitored as follows: <br /> t� Secondary containment will be equipped with a continuous monitoring system connected to an audible <br /> and visual alarm system. <br /> VAutomatic line leak detectors will be installed on pressurized piping <br /> Manufacturer: I/"' A /tag`( Model: TG6 - 155-0 <br /> Annual monitoring will be conducted on the pressurized piping with secondary containment. <br /> _ Annual line tightness test will not be required if the continuous monitor shuts down the pump and <br /> activates the alarm system when a release is detected and when the continuous monitoring system <br /> fails or is disconnected. <br /> 20. State water Resources Control Board "Facility (A)" and "Tank Permit (B)" application forms submitted. <br /> 21. Plan review and operating permit fees paid. `-J'',, _- -,( �" _ /� <br /> 22. what is the approximate depth to ground water: Aaax4 d�.�� l+U l�vlcS a'•C <br /> kfkd <br /> (include source of information - borehole logs, monitoring welt data, water <br /> studies, etc.) <br /> 23. `� Total number of tanks on site after installation: � '3y1 67)"� aSpF1.f ZO�IO <br /> 24. ✓ County/City Fire District and Building Department notified. <br /> 25. ✓ In the event contamination is observed, confirmed or suspected as a result of a Leaking UST system it is your <br /> responsibility (in accordance with (CCR) Title 23, Division 3, Chapter 16, Article 11, Corrective Action <br /> Requirements] as an owner or operator to submit a workplan to PHS-EHD Site Mitigation Unit prior to initiating any <br /> assessment or remediation activities. For further assistance contact the Site Mitigation Unit at (209) 469-3450. <br /> The owner or operator must acknowledge this responsibility for workplan submittal by signature and date below. <br /> Name Title Date <br /> CONDITIONS OF APPROVAL: <br /> .2 r. <br /> �� <br />