My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL INSTALLATION 2001
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
678
>
2300 - Underground Storage Tank Program
>
PR0516874
>
INSTALL INSTALLATION 2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:41:23 PM
Creation date
11/8/2018 10:01:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
INSTALLATION 2001
RECORD_ID
PR0516874
PE
2361
FACILITY_ID
FA0002463
FACILITY_NAME
PAQ Inc. DBA Food-4-Less
STREET_NUMBER
678
Direction
N
STREET_NAME
WILSON
STREET_TYPE
Way
City
Stockton
Zip
95205
CURRENT_STATUS
02
SITE_LOCATION
678 N Wilson Way
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\W\WILSON\678\PR0516874\INSTALLATION 2001.PDF
QuestysFileName
INSTALLATION 2001
QuestysRecordDate
3/21/2018 5:08:04 PM
QuestysRecordID
3832327
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 ! <br />NSTAUUATION PROCEOURES FOR UNDERGROUND STORAGE TAW <br />OLASTEEL" BED AND BACKFILL <br />ALL EXCAVATED NATIVE SOIL MUST BE REPLACED WITH APPROVED BACKPILL, 00 <br />NOT BACKFILL IN LAYERS USING DIFFGRENT MATERIALS, <br />APPROVED BACKFILL MAYGRIALS ARE: <br />1. CLEAN WASHED SAND <br />2. GRAVEL <br />A CLEAN. NATURALLY ROUNDED AGGREGATE WITH A MIK OF PARTICLE SIZES N01 <br />LESS THAN 1/4' NOR MORE THAN 3/4• IS REQUIRED, THIS MATERIAL IS <br />COMMONLY CALLED PEA GRAVEL. <br />3. STONE OR GRAVEL CRUSHINOS <br />WASHED STONE OR GRAVEL CRUSAINGS WITH ANGULAR PARTICLE SIZE NOT LESS <br />THAN I/S- NOR MORE THAN 1/2' IS REQUIRED. <br />1. IF OUTER TANK MAINTAINS AT LEAST 5,3 IN. NO. OF VACUUM FOR ONE HOUR <br />BOTM THE INNER TANK AND OUTER TANK MAY SE CONSIDERED PROPERLY <br />TESTED. <br />2. INTERSITIAL SPACE TO BE VACUUM TESTED ONLY, <br />NOTE: MODERN WELDING COMPANY DOES NOT RECOMMEND HOLIDAY TESTING FOR <br />OLASTEEL It TANKS. - <br />TANK HANDLINb: <br />UNDERGROUND TANK(S) ARE SUPPLIED WITH EITHER ONE OR TWO INSTALLED LIFTING <br />LUGS. DEPENDENT ON TANK SIZE. REFER TO SPECIFIC TANK DRAWING TO DETERMINE <br />THE EMPTY LIFTING WEIGHT OF THE TANK. SEE FINISHING INSTRUCTIONS.- ITEM <br />NUMBER 71 FOR APPLICATION OF LIFTING LUG COVERS TO 'GLAQTEEL' TANKS PRIOR TC <br />SACKPILLING OR COVERING THE TANK. <br />DO NOT DROPIOR ROLL TANKS) FROM TRUCK INTO EXCAVATED OPENING, <br />Y <br />LIFTING PROCEDURES: <br />SECONDARY TANK <br />0°nwXIP%UA <br />oil* AINImum <br />Y- <br />r ---------------------------------------- <br />1 <br />I-F-RIAARY TANK I <br />I I <br />i 1 <br />I 1 <br />THESE INSTALLATION INSTRUCTIONS TAKE PRUCS05NC■ OVER ACT 100 INSTRUCTIONS <br />IN ANY AREA OF DIPPEIIENCE, <br />PAGE 2 OF 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.