My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1998
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1048
>
2300 - Underground Storage Tank Program
>
PR0231462
>
INSTALL_1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2019 8:09:08 AM
Creation date
11/8/2018 10:01:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1998
RECORD_ID
PR0231462
PE
2361
FACILITY_ID
FA0000508
FACILITY_NAME
7-ELEVEN INC #17647
STREET_NUMBER
1048
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95337
APN
21903003
CURRENT_STATUS
01
SITE_LOCATION
1048 W YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\Y\YOSEMITE\1048\PR0231462\1998 INSTALL.PDF
QuestysFileName
1998 INSTALL
QuestysRecordDate
7/11/2016 11:13:50 PM
QuestysRecordID
3137878
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
221
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ile <br /> ® Anchoring <br /> Hold down straps, if required, shall be in- <br /> stalled in such a manner that they do not <br /> damage the Tank Jacket. Use Strap - <br /> Cushions to insure that the steel straps <br /> are cushioned and separated from the m <br /> t Tank Jacket. e <br /> 7 The method of anchorage selected shall <br /> j conform with state and local codes, <br /> whichever applies. <br /> O Final Testing <br /> After installation and before final backfill- <br /> ing to grade the Tank Jacket must be ' 3" <br /> . <br /> retested to assure no damage occurred .2 4. <br /> during installation. <br /> Perform an air pressure hold test to no 1 9 <br /> greater than 2 psi for a period long enough <br /> J vs. <br /> to determine there are no leaks by a drop <br /> in pressure. <br /> Note: For tanks shipped with a vacuum, it <br /> is not necessary to perform an in ground <br /> test as long as vacuum was maintained. <br /> i 10 Attaching Standpipe <br /> After all testing is completed and before <br /> final backfilling to grade attach the Tank <br /> Jacket Standpipe provided.The Standpipe <br /> can be cut to the appropriate length re- <br /> quired. Make sure that the cross fitting is <br /> glued to the Standpipe, with water resis- GLUE <br /> tant PVC cement. <br /> Make sure the cross fitting is capped if <br /> conduit is not installed. <br /> 11 Post-installation Testing <br /> Should an air-pressure hold test be re- <br /> quired to determine the containment in- i. <br /> tegrity of the Tank Jacket in future years <br /> then an Air-Pressure Bypass Adapter <br /> should be used to bypass the cross fitting <br /> conduit openings. This adapter is available - <br /> from Total Containment, Inc. '` <br />
The URL can be used to link to this page
Your browser does not support the video tag.