My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1998
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1048
>
2300 - Underground Storage Tank Program
>
PR0231462
>
INSTALL_1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2019 8:09:08 AM
Creation date
11/8/2018 10:01:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1998
RECORD_ID
PR0231462
PE
2361
FACILITY_ID
FA0000508
FACILITY_NAME
7-ELEVEN INC #17647
STREET_NUMBER
1048
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95337
APN
21903003
CURRENT_STATUS
01
SITE_LOCATION
1048 W YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\Y\YOSEMITE\1048\PR0231462\1998 INSTALL.PDF
QuestysFileName
1998 INSTALL
QuestysRecordDate
7/11/2016 11:13:50 PM
QuestysRecordID
3137878
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
221
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
loll <br /> PERFORMANCE SPECIFICATION - CONTINUED <br /> SECTION IX CANOPIES -- CONTINUED °' <br /> PART 3 — EXECUTION —CONTINUED <br /> :5.1 .17 FABRICATION DRAWINGS SHALL BE DELIVERED TO APPLICABLE CONSTRUCTION OFFICE <br /> L <br /> A MINIMUM OF 4 WEEKS PRIOR TO COMMENCEMENT OF CONSTRUCTION. NO WORK <br /> SHALL COMMENCE PRIOR TO APPROVAL OF DRAWINGS BY SOUTHLAND'S CONSTRUCTION <br /> REPRESENTATIVE. <br /> 3.2 EXECUTION: <br /> 3.2,1 COORDINATE DELIVERY AND INSTALLATION WITH GENERAL GASOLINE INSTALLER Q y <br /> THROUGH LOCAL CONSTRUCTION OFFICE. MATERIALS SHALL BE STORED AT POSITION AS T5 <br /> INDICATED BY GENERAL GASOLINE INSTALLER. <br /> 3.2.2 CANOPY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING FOOTING ANCHOR <br /> BOLTS AND TEMPLATE FOR DELIVERY TO GENERAL GASOLINE INSTALLATION CONTRACTOR <br /> 2 WEEKS PRIOR TO INSTALLATION. SIZE IN ACCORDANCE WITH SHOP DRAWINGS AND IN <br /> ACCORDANCE WITH GASOLINE INSTALLING CONTRACTOR'S SCHEDULE OF CONSTRCUTION. <br /> 3.2.3 FOOTINGS FOR CANOPY AND PLACEMENT OF ANCHOR BOLTS SHALL BE PERFORMED BY <br /> GENERAL GASOLINE INSTALLER AS PER APPROVED SHOP DRAWINGS. TYPE OF CONCRETE <br /> SHALL BE AS PER SHOP DRAWINGS. TYPE, SIZE, AND PLACEMENT OF ALL REINFORCED <br /> STEEL SHALL BE AS PER SHOP DRAWINGS. <br /> 3.2.4 THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS BEFORE STARTING WORK AND <br /> NOTIFY SOUTHLAND'S CONSTRUCTION REPRESENTATIVE IMMEDIATELY OF ANY DISCREPANCIES <br /> FOUND. REFER TO SITE PLAN FOR SIZE, TYPE AND PLACEMENT OF CANOPY. <br /> 3.2.5 CANOPY CONTRACTOR SHALL BE RESPONSIBLE FOR BEING PROPERLY LICENSED IN <br /> LOCAL INSTALLATION AS WELL AS PROVIDING OWN PERMITS AS MAY BE REQUIRED. A <br /> COPY OF THE PERMIT MUST BE ON FILE IN THE LOCAL CONSTRUCTION OFFICE PRIOR <br /> TO COMMENCING WORK. <br /> 3.2.6 CANOPY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING CONSTRUCTION OFFICE rn <br /> WITH ACCEPTABLE INSURANCE AS REQUIRED PER SOUTHLAND CORPORATION INSURANCE q <br /> SPECIFICATIONS AND STANDARD CONTRACT FOR CONSTRUCTION. INSURANCE SHALL BE Q <br /> IN EFFECT FOR DURATION OF WORK. <br /> 3.2.7 CANOPY CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ALL WORK OF rte, <br /> OTHER CONTRACTORS ALREADY IN PLACE, AS MAY BE REQUIRED. ,] <br /> 3.2.8 CANOPY CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING AND OBTAINING <br /> APPROVAL OF GENERAL GASOLINE CONTRACTOR PRIOR TO PLACING OF ANY HEAVY �c <br /> EQUIPMENT ON TOP OF CONCRETE WORK ALREADY IN PLACE. <br /> 3.2.9 ALL FOOTINGS SHALL BE ON FIRM UNDISTURBED SOILS OR FILL COMPACTED <br /> 0 <br /> Y <br /> TO 95% MAXIMUM DENSITY BASED ON A.S.T.M. D 7557-70. IF ANY POOR SOIL <br /> CONDITION IS DISCOVERED DURING EXCAVATION, THE DESIGN ENGINEER SHALL BE °? 2 <br /> O <br /> NOTIFIED IMMEDIATELY FOR SOIL BEARING VERIFICATION. <br /> 3.2.10 SUPPORTING COLUMNS SHALL BE PLACED AS PER SOUTHLAND GASOLINE PLANS AND <br /> AS PER APPLICABLE SITE PLAN. .K <br /> 3.2.11 CANOPY SUPPORT COLUMNS SHALL BE CAPPED AT TOP. <br /> 3.2.12 All MATERIALS SHALL BE ALIGNED TRUE AND FLAT AND ALL PLANES SHALL BE <br /> FLAT, TRUE TO ESTABLISHED LINES WITH ALL SOFFITS BEING LEVEL AND VERTICAL a <br /> WALLS CORRECT AND ACCEPTABLE. PARAPET FASCIA SHALL BE VERTICAL AND PLUMB. '� a <br /> ALL INTERSECTIONS SHALL BE TRUE AND STRAIGHTEDGE LINES. MATERIALS SHALL BE w ,r <br /> LEFT IN ACCEPTABLE CONDITION TO BE PAINTED BY OTHERS. ALL METAL SHALL BE <br /> FREE OF DEBRIS AS MAY BE REQUIRED FOR FINAL PAINTING/FINISHING. LZ <br /> vu; w 3X <br /> 3.2.13 INSTALLING CONTRACTOR SHALL BE RESPONSIBLE FOR POURING OF CONCRETE <br /> U <br /> AROUND CANOPY COLUMNS, COVERING ANCHOR BOLTS AS MAY BE REQUIRED. Z ti^ y <br /> ^ 3.2.14CANOPY CONTRACTOR SHALL LEAVE ALL EXPOSED STRUCTURAL STEEL FREE OF -1W U <br /> DEBRIS, PRIMED AND READY FOR FINAL PAINTING BY GASOLINE CONTRACTOR. a ^ <br /> 3.3 RESPONSIBILITIES OF GENERAL GASOLINE CONTRACTOR: 1 0 3 a <br /> 3.3.1 SHALL BE RESPONSIBLE FOR A MINIMUM OF 30 DAY NOTIFICATION OF DATE WHEN <br /> SITE WILL BE READY FOR INSTALLATION OF GASOLINE CANOPY. <br /> 3.3.2 UPON AGREED DATE BETWEEN GASOLINE CONTRACTOR AND CANOPY CONTRACTOR, 3 <br /> yTJ THE SITE SHALL BE FREE OF MATERIAL, MOVABLE EQUIPMENT AND DEBRIS, LEVEL. AND <br /> IN PROPER CONDITION FOR CANOPY INSTALLATION. GENERAL GASOLINE CONTRACTOR <br /> SHALL PERFORM SITE WORK AS MAY BE REQUIRED TO COMPLY. <br /> 3.3.3 GASOLINE CONTRACTOR SHALL NOT INSTALL GASOLINE DISPENSERS PRIOR TO CANOPY <br /> ERECTION, UNLESS AGREED UPON IN WRITING BETWEEN THE CANOPY INSTALLER AND <br /> � aa[a GASOLINE INSTALLER. <br /> E 3.3.4 GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE INSTALLATION OF CANOPY <br /> m` FOOTINGS AS DESIGNED IN SHOP DRAWINGS PROVIDED BY CANOPY MANUFACTURER, <br /> PROVIDING ALL STEEL, ETC., WITH THE EXCEPTION OF ANCHOR BOLTS TO BE <br /> PROVIDED BY CANOPY INSTALLER). FOOTINGS SHALL BE POURED IN A SUFFICIENT <br /> AMOUNT OF TIME, SO PROPER CURING TIME IS ALLOWED. <br /> 3.3.5 GASOLINE CONTRACTOR SHALL BE RESPONSIBLE FOR PAINTING OF ALL METAL AND <br /> o TRIM AS RELATED TO THE GASOLINE CANOOPY AS PER STANDARD COLOR REQUIREMENTS. . <br /> T <br /> 3.3.6 GASOLINE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL WIRING AND INSTALLATION yy <br /> ;u a ,1 OF LIGHTS, SIGNS, SECURITY LIGHTS, ETC., IN CONJUNCTION WITH NORMAL <br /> GASOLINE INSTALLATION. <br /> �a 3.3.7 GASOLINE CONTRACTOR SHALL BE RESPONSIBLE FOR LEAVING BLOCKOUTS AS MAY <br /> r- <br /> m BY REQUIRED FOR INSTALLATION OF CANOPY IN ACCORDANCE WITH SHOP DRAWINGS, <br /> AND PLACEMENT OF ANCHOR BOLTS IN ACCORDANCE WITH SHOP DRAWINGS AS RELATED " <br /> THERETO. <br /> n 3a <br /> 3.4 WARRANTIES: CANOPY CONTRACTOR SHALL WARRANtt, IN WRITING, COMPLETE CANOP'f <br /> INSTALLATION FOR A MINIMUM PERIOD OF 2 YEARS. A 5 YEAR WARRANTY _ <br /> T "a } GUARANTEEING INSTALLATION TO BE FREE OF DESIGN AND INSTALLATOIN DEFECTS. DATE: 15JUL97 <br /> INCLUDINOS ACTS OF MAN, GOD AND NORMAL_ WEAR AND TEAR, SHALL BE COVERED. <br /> S� ? 3.5 CLEAN-UP: CANOPY CONTRACTOR SHALL BE RESPONSIBLE FOR CLEAN-UP AND PROJECT NO- <br /> REMOVAL FROM SITE ALL TRASH AND DEBRIS RESULTING FROM WORK RELATING TO 5026.20 <br /> INSTALLATION OF CANOPY. <br /> DRAWN: <br /> MSP <br /> s <br /> APPROVED: CL <br /> x DRAWING <br /> PSP-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.