Laserfiche WebLink
SW UST INSTALLATION INSPECTION RECORD <br /> FACILITY NAME: 21 <br /> ADDRESS: v <br /> FACILITY 10# TANK# UL# 7 W 6 TANK MODEL/MATERIAL: Mza <br /> CAPACITY: PRODUCT: R.E.H.S':: <br /> p N ALL TANKS TO BE INSTALLED AND TESTED IN #ECCRDA17Lc —T <br /> P I WITH MANUFACTURER WRITTEN SPECIFICATIONS 1 <br /> R T <br /> 0 1 <br /> V A <br /> E L <br /> D S <br /> ITEM OR EQUIPMENT INSPECTED <br /> DATE <br /> 16/,*Jf VA �1. UST PLANS SUBMITTED/ FEES PAID CHIS CODE 25287) <br /> "� /s5 I1 UST INSTALLATION PLANS APPROVED <br /> INITIAL INSPECTIONS <br /> 3. INSPECTION AND TEST OF SEC NDARY CONTAINMENT: HOLIDAY: <br /> VACUUM: SOAP: PSI:S_NDA <br /> 6-0 SRINE(LIOUID ANNULAR): OTHER: <br /> �y_4* ft( 4. PRIMARY TANK TEST: PSI: 3-0 HRS/ i.)) 6C) <br /> I <br /> 5. TANK APPROPRIATELY PLACED WITH APPROVED BACKFILL (API/PE I) <br /> PIPING INSPECTIONS <br /> 6. PRIMARY PIPING TEST (MINIMUM 40 PSI/30 MIN) (CCR 2636 (e)) <br /> 7. SECONDARY PIPING CONTAINMENT TEST PSI: HRS/MIN: OTHER: (CCR 2636 (e)) <br /> i <br /> ISS 8. LAKE TEST ON ALL SUMPS (24 HR. MINIMUM) HRS: (CCR 2635 (a) (4)) <br /> S� 9. UNUSED TANK OPENINGS SEALED AND CORROSION PROTECTED PEI <br /> I10. OVERSPILL PERFORMANCE TEST (CCR 2635 (b) (1) (C)) <br /> 171 i <br /> SS 11. ALL PIPING AND FITTINGS CORROSION PROTECTED (CCR 2636 (b)) <br /> ISS 12. PIPING SLOPES TO COLLECTION SUMP (CCR 2636 (c)(1)) <br /> FINAL INSPECTION <br /> x l3. PERFORMANCE TEST FOR "ALV' MONITORING PROBES (CCR 2632 (c) (2)) <br /> i <br /> �1 5 rj,14. PERFORMANCE TEST OF CONTINUOUS MONITORING SYSTEM (PANEL) (CCR 2632 (c) (2)) <br /> 15. PERFORMANCE TEST OF LINE LEAK DETECTION (CCR 2643 (c) (1)) <br /> Oh7 <br /> 16. PERFORMANCE TEST OF AUTOMATIC PUMP SYSTEM SHUT-OFF (CCR 2636 (B)) <br /> 4zt�� <br /> BALL FLOAT VALVES INSTALLED <br /> OVERFILL PROTECTION INSTALLED/APPROVED (CCR 2635 (b) (2)) <br /> TANK ACCESS PORTS BROUGHT TO GRADE CLOCKED AND WATERTIGHT) API <br /> TANK INTEGRITY TEST (PASSING HARD COPY) (LCR 2635 (a) (5)) <br /> NG PLAN, RESPONSE PLAN AND LOG BOOK ON SITE (CCR 2632 (d)) <br /> 1 / COMPLETED AND SUBMITTED (CCR 2635 (d)) <br /> q1-7h L�93. MONITORING METHOD FOR ALL TANKS AND PIPING APPROVED (CCR 2630-2636) <br /> I ALL CONDITIONS MET; FACILITY PERMIT ISSUED (HIS CODE 25284) <br /> /�5 s 4 <br /> s� GJ n /(JP6 /o <br /> COMMENTS: <br /> ;423-006 9/95 <br /> 10 <br />