Laserfiche WebLink
PLOT PLANOO PROPOSED CHANGES TO FUZL SYSTEM <br /> SCALE: I" a 10° <br /> S S 8' 5 7' d 12 0.0 0' <br /> EXISTING VENT PIPING. -f0 REMAIN UNCHANGED. <br /> I. EXISTING CONCRETE TANK SLAB. TO REMAIN UNCHANGED, <br /> EXISTING SUBMERGED TURBINE PUMP SUMP, TO REMAIN UNCHANGED, <br /> EXISTING UNDERGROUND 92 OCTANE FUEL STORAGE TANK. TO REMAIN UNCHANGED, <br /> LANDSCAPING ARE/ L EXISTING DUAL POINT PHASE I VAPOR CONNECTION, TO REMAIN UNCHANGED. <br /> I (1.6 EXISTING EXTRACTOR FITTING FOR THE VAPOR RECOVERY, TO REMAIN UNCHANGED, <br /> Com..,) EXISTING TANK FILL CONNECTION. TO REMAIN UNCHANGED, <br /> I = EXISTING INTERSTITIAL SPACE MONITOR, TO REMAIN UNCHANGED, <br /> I. EXISTING 92 OCTANE PRODUCT PIPING ENVIROFLEX PRIMARY PIPING, TO REMAIN UNCHANGED. <br /> --------------- -�-°------------- -------- PARKING l_QT STRIPING .I EXISTING 87 OCTANE PRODUCT PIPING ENVIROFLEX PRIMARY PIPING. TO REMAIN UNCHANGED, <br /> 7-ELEVEN SS# 17647TO BE VERIFIED WITH I.11 EXISTING UNDERGROUND 87 OCTANE FUEL STORAGE TANK, TO REMAIN UNCHANGED. <br /> 1048 WNST YxTS Fav , <br /> RHL GROUP INC PLANS GID EXISTING DISPENSER PIPING SUMP TO BE CONVERTED TO A TRANSITION SUMP, <br /> MANTSCA, CA <br /> -PROPOSED CHANGES,'- <br /> _ .1 NEW 42" ROUND MANHOLE OVER THE TRANSITION SUMP, USING THE SAME MODEL_ AS THE EXISTING <br /> -LJT_..) PIPING SUMPS <br /> NEW ENVIROFLEX PRIMARY PIPING COUPLING TO CONNECT THE EXISTING PIPING TO THE NEW PIPING <br /> TO THE RELOCATED DISPENSER. <br /> USE THE EXISTING SUMP SENSOR 1.0 CHECK THE NEW TRANSITION SUMP FOR LIQUID, <br /> CONCRETE DRIVE SLAB. <br /> RELOCATE THE EXISTING DISPENSER AND PAN SENSOR TO THE PROPER LOCATION, <br /> RELOCATE THE FUEL ISLAND TO THE PROPER LOCATION. <br /> 7 RELOCATE THE EXISTING LIGHT POLES TO THE PROPER LOCATION. <br /> .8 MODIFY THE PHASE 11 VAPOR PIPING TO MEET THE PROPER DISPENSER LOCATION, <br /> .9 MOVE T <br /> O E FI E EXISTING 87 OCTANE PRODUCT PIPING TO THE PROPER LOCATION. <br /> J MOVE THE EXISTING 92 OCTANE PRODUCT PIPING TO THE PROPER LOCATION. <br /> \\ II NEW PIPING FROM THE PIPING;, SUMP TO 7HE NEW DISPENSER LOCATION. <br /> 0 _ z <br /> 00 <br /> L LI <br /> __._..._...._._ PROPERTY LINE ZN 2.• <br /> c I I L I <br /> 2- i- PROJECT DEFINITION.0 <br /> 4.6 187 OCTANE I I <br /> 7 TANK 92 OCTANE - I THE PROBLEM WITH THE INITIAL INSTALLATION OF THE FUEL_ ISLAND EQUIPMENT IS THAT THE FUEL_ <br /> B. <br /> 4 <br /> TANK ISLAND WAS LAID OUT OFF OF A DIFFERENT- BLUEPRINT TI-LEN THE CITY APPROVED SET OF <br /> _ .___. ` DRAWINGS. THE APPROVED SET OF DRAWINGS DID NOT 'ZHOW AN OVERHEAD CANOPY AND THE <br /> C — I._ FUEL ISLANDS WERE SHOWN TO BE A 246' X 24' LAYOL THE OWNER DESIRED THAT THE DISPENSFPS <br /> BE SPREAD OUT TO A 24' X 36' LAYOUT. THE INSTALLER USED A BLUEPRINT THAT SHOWED THE X <br /> 36' LAYOUT, BUT THE ACTUAL PLACEMENIT OF THE ISLAND WAS (Y TOO CLOSE TO THE BtJIG.DING, <br /> C TO RECTIFY THE PROBLEM WE ARE PROPOSING T0: <br /> C • M-D- I 1. REMOVE THE EXISTING FUEL ISLAND EQUIPMENT AND ,ORE FOR RE-INSTALLATION, <br /> 2. SAW CUT. ,JACK HAMMER AND REMOVE THE EXISTING FUEL ISLAND CONCRETE. <br /> 3. EXCAVATE AND UNCOVER THE EXISTING PIPING, PIPING SUMPS, ELECTRICAL CONDUITS AND <br /> RELATED EQUIPMENT. <br /> " C,)rc� 4. DISCONNECT THE PIPING AND EL.ECTRICAI_ FROM THE EXISTING LOCATIONS AND PREPARE TO <br /> MOVE THEM TO 'THE PROPER LOCATION. <br /> -.-.- <br /> - LANDSCAPING AREA 5, CONVERT THE EXISTING DISPENSER PAN TO A PIPING 'TRANSITION SUMP, <br /> 6, CONVERT -THE EXISTING DISPENSER PAN LIQUID SENSOR TO A TRANSITION SUMP SENSOR, <br /> I 7. INSTALL A NEW DISPENSER PAN AT THE PROPER LOCATION. (FOR THE PAN THAT IS CLOSEST TO <br /> �o THE TANKS.) <br /> R 20" 8, RELOCATE THE DISPENSER PAN TO THE NEW LOCATION. (FOR THE PAN THAT IS FURTHEST FROM <br /> THE TANKS.) <br /> L=32.20' 9. RELOCATE THE EXISTING PIPING THAT IS INSTALLED FROM ONE ISLAND TO THE OTHER. TO THE <br /> �.� 92* 15' PROPER LOCATION. <br /> 10. INSTALL NEW PIPING FROM THE TRANSITION SUMP TO THE NEW DISPENSER PAN LOCATION. <br /> N 8® 57' E I1. EXTEND THE ELECTRICAL CONDUITS FROM THE EXISTING DISPENSER LOCATIONS TO THE PROPER <br /> LOCATION, <br /> 12, RE-PULL WIRES IN THE EXISTING CONDUITS FOR THE EQUIPMENT, <br /> 13, INSTALL NEW FOOTINGS FOR THE FUTURE OVERHEAD CANOPY. <br /> 14. PRESSURE TEST THE PIPING AND FUELING SYSTEM.. <br /> 15. HAVE THE PIPING INSPECTED. <br /> 16. BACKFILL AND COMPACT THE EXCAVATED AREA, <br /> A <br /> 17. FORM AND POUR THE CONCRETE THAT WAS DISTURBED. <br /> _ _. 18. RE-INSTALL THE DISPENSERS AND LIGHT POLES, <br /> 19. INSTALL NEW PAN SENSORS IN THE DISPENSER PANS, <br /> 20, CONNECT THE ELECTRICAL WIRING AS REQUIRED, <br /> 21, START UP THE SYSTEM AND TEST ITS OPERATION, <br /> YOSEMITE AVENUE (HWY 120) <br /> � SCALE. V 10° <br /> t V.dk <br /> 4,v FAY '`t i-'tp�qp <br /> 01" MISCELLANEOUS NOTES:THE EQUIPMENT THAT WILL BE USED FOR THIS PROJECT WILL BE THE SAME EQUIPMENT THAT WAS <br /> SUBMITTED BY SOUTHLAND FOR THE ORIGINAL PROJECT. THERE WILL BE NO DIFFERENT EQUIPMENT <br /> THAT WILL BE USED, THE CONTRACTOR ASSUMES NO RESPONSIBLE FOR ENGINEERING THE GRADES ON THE LOT. <br /> IF ANY GRADES ARE TO BE ENGINEERED IT I$ TO BE DONE BY A REGISTERED ENGINEER, <br /> THE CONTRACTOR WILL MATCH EXISTING GRADES OR PAVEMENT, ONLY, <br /> THIS DRAWING, PRINT, SKETCH AND/OR TECI-INICAL DATA ARE THE PROPERTY <br /> OF BANKS & CO. INC. AND THE SAME AND/OR ANY INFORMATION THEREIN. <br /> SHALL NOT BE USED WITHOUT PERMISSION IN WRITING FROM BANKS & CO, INC. <br /> FOR ANY PURPOSE OTHER THAN FOR THE PERFORMANCE OF A CONTRACT TO <br /> WHICH BANKS & CO. INC, IS A PART. <br /> 2-403 BELMONAVE_ <br /> / � I V I \ CSC S CO PHONEL(2009) 485-3456 AXS(2009)485-31GI <br /> L_) <br /> DATE NAME/REVISION APPRV, <br /> 7-ELEVEN SS #1764/ <br /> 1048 W. YOSEMITE BLVD, <br /> MANT'ECA, CA <br /> _ _ __...._._._ ._ _ S C A I_E P A G E <br /> -----, __.__ _.__...__._ _.______.... _._._......,_. .._......_.._.__.___.._._.__ .._ _ _. _..__ _._. __ __ ,_I.__.._ <br />