Laserfiche WebLink
1.1 ^ Three complete sets of r •s (include manufacturer's specification sh, for proposed equipment to be installed). <br /> 2. Plans drawn to scale in <br /> non erasable print. .../ <br /> 3. Plot plan to show location of tanks and all associated piping. <br /> 4. Striker plates or drop tube-mounted bottom protectors illustrated below all accessible openings. <br /> 5. Tank cross-section( diagram. <br /> 6. Detail of tank., associated piping, excavation and cover. <br /> i." <br /> 7. Tank(s) and piping approved by a nationally recognized independent testing organization. [Title 23, Chapter 16, <br /> Article 3, Section 2631 (b) & 26351 <br /> 8. Verification of product compatibility with the tank(s), piping, monitoring <br /> device(s), epoxy or silicone glues, etc. <br /> 9. * Manufacturer's written installation instructions for tank(s), piping, monitoring devices, etc. <br /> 10. At the installation site, prior to installation, a tightness test shall be performed on both primary (10) and <br /> secondary (20) containment systems before covering. [Section 2635 (a) (3) & (4)) <br /> 11. Tank integrity test required upon completion of installation with tank in operating condition. Test results to be <br /> submitted directly to PHS-EHD from the testing company or owner of facility. [Health & Safety Code, Division 20, <br /> Chapter 6.7, Section 25291 (h)) <br /> 12. TANK COMPOSITION <br /> TANK # # DI # 62 # # # <br /> CAPACITY <br /> MANUFACTURER jj 11� <br /> COMPOSITION 1 <br /> MODEL 5T 910 <br /> PRODUCT A I. pp-on.Lin I. <br /> CORROSION PROTECTION t6pe 9DP6 <br /> U.L. LISTED 'L5 S <br /> COMPATIBILITY WITH 100% <br /> METHANOL <br /> 13. TANK(s) TO BE INSTALLED <br /> A. Steel-clad with fiberglass reinforced plastic coatings, composites, or equivalent non-metalLic exterior <br /> coatings or coverings. <br /> (1) Tested at the installation site using an electric resistance holiday detector. <br /> (2) Vacuum applied to interstitial space. <br /> a. Fiberglass <br /> (1) Installation instructions require an air test and soap bubble test prior to installation. <br /> (2) Vacuum applied to interstitial space. <br /> (3) Hydrostatic armwlar (primary tank pressure test). <br /> C. Non-clad steel tank [Section 2635 (a) (2) (A)) <br /> (1) Cathodic protection provided for entire tank, piping and components (nuts, bolts, washers, <br /> etc.). <br /> (2) Field installed cathodic protection systems designed and certified as adequate by a <br /> corrosion specialist. <br /> (3) Impressed current systems to be inspected no less than every 60 days. <br /> 5 <br />