Laserfiche WebLink
Underground Storage Tank Program Inspection Report <br /> Facility Name: <br /> AHMEDS SONS INC <br /> Facility Address: <br /> 1257 W YOSEMITE AVE, MANTECA, CA 95336 <br /> Facility Phone: <br /> (209) 823-1724 <br /> Program: <br /> 2361 - UST FACILITY <br /> Inspection Type: <br /> ROUTINE INSPECTION - Operating Permit <br /> Date: <br /> April 09, 2018 <br />San Joaquin County <br />Environmental Health Department <br />1868 East Hazelton Avenue, Stockton, California 95205-6232 <br />Telephone: (209) 468-3420 Fax: (209) 468-3433 Web: www.sjgov.org/ehd <br /> CERS ID: <br /> 10181329 <br /> Inspection Contact: <br /> Nadeem Ahmed <br /> Consent For: Consent Given By: <br /> Nadeem Ahmed, Owner <br /> Title: <br /> Owner <br /> Phone: <br /> () - <br />T Inspection T Photos T Samples <br /> Service Technician Manufacturer's Training: <br /> VMI, 09/26/19; Veeder Root, 01/03/19 <br /> Service Technician Onsite: <br /> Mark Williams <br /> Exp. Date: <br /> 09/13/2019 <br /> Designated Operator: <br /> David Turner <br /> Exp. Date: <br /> 07/09/2019 <br />R = Repeat violation COS = Corrected on site during inspectionV = Violation <br />CCR = California Code of Regulations HSC = Health and Safety Code CFR = Code of Federal Regulations <br />File Review <br /> 101 □ V □ R □ COSFailure to obtain a valid permit to operate from the EHD including but not limited to unpaid feesHSC 25284 <br /> 102 □ V □ R □ COSNo written agreement between tank owner and tank operator to monitor the tank systemHSC 25284(a)(3)(A)/(B) <br /> 103 □ V □ R □ COSCurrent financial responsibility documents not submittedHSC 25292.2, 25299.30 <br /> 104 ■ V □ R □ COSUST operating permit application for facility and tank information not submitted or currentCCR 2711 <br /> 105 ■ V □ R □ COSFailed to have an approved UST monitoring planCCR 2632(d)(1), <br />2634(d) <br /> 106 □ V □ R □ COSFailed to have an approved UST response planCCR 2632(d)(2), <br />2634(e) <br /> 107 ■ V □ R □ COSPlot plan/site map not submitted or failed to completely show where monitoring is performedCCR 2632(d)(1)(C) <br /> 108 □ V □ R □ COSFailed to notify the EHD 48 hours prior to conducting testingCCR 2637(f), 2638(e) <br /> 109 □ V □ R □ COSFailed to test secondary containmentCCR 2637 <br /> 110 □ V □ R □ COSFailed to submit secondary containment test report within 30 daysCCR 2637(e) <br /> 111 □ V □ R □ COSFailed to test monitoring and leak detection equipment annuallyCCR 2638(a) <br /> 112 □ V □ R □ COSFailed to test spill containers annuallyHSC 25284.2 <br /> 113 □ V □ R □ COSFailed to submit monitoring system certification test report within 30 daysCCR 2638(d) <br /> 114 □ V □ R □ COSFailed to perform 0.1 gph annual line test for pressurized piping without fail safe or shut downCCR 2636(f) <br /> 115 ■ V □ R □ COSFailed to submit to EHD notification of designated operator identification or change w/in 30 daysCCR 2715(a) <br /> 116 □ V □ R □ COSDesignated operator, service tech or installer did not possess current ICC certificationCCR 2715 <br /> 117 □ V □ R □ COSFailed to inspect a lined or repaired steel tank within 10 years of lining and every 5 years afterCCR 2663(h) <br /> 118 □ V □ R □ COSFailed to submit tank lining certification within 30 days or to conduct proper testsCCR 2663 <br /> 119 □ V □ R □ COSDocuments were falsified or misrepresentedHSC 25299(a)(8), <br />25299(b)(7) <br /> 120 □ V □ R □ COSFailed to submit UST Certification of Installation/ModificationCCR 2635(d) <br /> 121 □ V □ R □ COSFailed to submit a written response within 30 days of receiving an inspection reportCCR 2712(f) <br /> 122 □ V □ R □ COSFailure to submit and maintain UST system component statement of compatibility for substance storedCCR 2631(j) <br />On Site Records <br /> 201 ■ V □ R □ COSFailure to maintain monitoring, maintenance, and follow up action recordsCCR 2712(b) <br /> 202 □ V □ R □ COSFailed to maintain cathodic protection test records on site for at least 6 1/2 yearsCCR 2712(b) <br />Page 1 of 6 <br />FA0003707 PR0231463 SC001 04/09/2018 <br />EHD 23-01 Rev. 09/22/16 Underground Storage Tank Program OIR