Laserfiche WebLink
QG/17/1,998 17: 38 209-825-42 3/W INN OF MANTECA PAGE09 <br /> Piping (cross-Sectional diagram, including <br /> connections to tank and diaPeroen• <br /> (A) VMC and tank riser primary contBirmRnt System equipped with overfill prevention system that: <br /> Restricts delivery of flow to tank (Section <br /> 2635 (b) (2) (B) or (U1, or <br /> Provide positive shut off of flow to the tank at no mora :han 95 % (Section 2635 (b)(2)(C)I, or <br /> (B) Vapor recovery Piping designed so it carrot contain liquid phase product, or <br /> Suction piping (below grade piping operates or less than atmospheric pressure) (Section 2636 (s) (3)) <br /> Shead so contents of the pipe wilt drain back into the storage -tank if the suction is <br /> raleased. <br /> Mo valves Or puigs instal Led below grade. <br /> (napeRion method provided to demonstrate Compliance with section 2636 (a) (3). <br /> (0) Corrodible underground piping protected against corrosion (Sectfon 2636 (b)). <br /> (E) Underground primary piping wilt meet all of the following requirements <br /> Primary piping in conrwt with hazardous substance under normal operation condttfons shall be: <br /> installed inside a Secondary containment system in the form of: secondary pipe_yault or <br /> _lined trench to be sloped to a coltectim guys, at the low point of the piping. <br /> Primary piping and secondary concafinent systema will be installed in accordance with industry <br /> Cade of practice W voluntary consensus standards.. <br /> Lined trench used as secondary =r,ainlenT <br /> Material toipetible with the subscanee stored. <br /> Covered and capable of Supporting any expected vehicular traffic. <br /> (F) Underground piping with secondary containment AiLL be equipped and monitored as follows: <br /> Smc Bary cOn"Innent will be equipped with a ccntinuous monitoring System connected to an audible <br /> and visual alone syecsy. <br /> Automatic tine Look detectors will be installed on pressurized piping <br /> Manufacturer: Model- <br /> _ ArnusL monitoring will be conducted on the premrized piping with secondary Cpntairnsmc- <br /> Annual time rightness test will roc be required if the continuous monitor shuts down the pup and <br /> activates the $tarn system when a relesse is detected and when the continual msnitoring System <br /> fait* or is disco Tea. <br /> 20. State Yater Resources Concrol loard 'Facility (A)m and Rank Permit (B)w application forms submitted. <br /> 21- Plan review and operating Permic fees paid. <br /> 22. What is rhe approkimee depth to greed "ter: <br /> (include Source of Informations - borehole logs, nom torirmg well does, water <br /> studs", etc.) <br /> 23. Total rook r of ranks an site after installation: <br /> 24• County/City Fire District aro Building Department notiffed. <br /> 25. In the event contsinetion is Observed. Confirmad or suspected as a result of a leaking UST systen it is your <br /> responsibility (in acCordancs with (CQ) Title 23, Division 3, Chapter 16, Article 11, Corrective Acrion <br /> Raquirsmenra) as an owner or operator to submit a workplan to PNS-EHD site Mitigation Unit prior to initiating arty <br /> assessment or remediation activities. For further assistance contact the Site Mitigation Unit at (209) 469-3450. - <br /> the owner or operator :must acknowledge :his rnpaxibility for workplan submittal by signature and date below. <br /> Meme Title Date <br /> :tD)O ITIOMS OF APPROVAL: J r <br /> e <br /> 8 <br /> JUN-17-1998 17:23 209 825 4251 96% P.09 <br />