My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1998-2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1434
>
2300 - Underground Storage Tank Program
>
PR0231465
>
COMPLIANCE INFO 1998-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2023 10:49:21 AM
Creation date
11/8/2018 10:02:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998-2003
RECORD_ID
PR0231465
PE
2361
FACILITY_ID
FA0003739
STREET_NUMBER
1434
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
Ave
City
Manteca
Zip
95337
CURRENT_STATUS
01
SITE_LOCATION
1434 W Yosemite Ave
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\Y\YOSEMITE\1434\PR0231465\COMPLIANCE INFO 1998-2003.PDF
QuestysFileName
COMPLIANCE INFO 1998-2003
QuestysRecordDate
6/26/2017 11:25:13 PM
QuestysRecordID
3467494
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
268
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ub ld Yo 1o:U4 rue 12066LL9bza NW PUMP EQUIP. »»» TIME OIL _ X006 <br /> BRAVO <br /> IPW <br /> B-2000 DISPENSER l <br /> Ni-.,w INSIALLATIC NS <br /> A. To save on labor and time in removing debris, cover the <br /> 8-200 box with cardboard,plywood or heavy plastic during <br /> installation. C/L AMa° <br /> Myl\ <br /> B. Cover all threads to keep threaded connections clean. <br /> INTZNut\ <br /> 1. For each Bravo box, cut two 2 x 4's and secure to the island <br /> form.The angled supports are S" below the finished floor. (See O <br /> 3-A). The box flange should be even with the island's finished G/L <br /> floor. <br /> Aaplee CCUN ° <br /> 2. To determine the permanent position of the Bravo box inside G/ Sudodn: 3-A <br /> the island form: Use the angled comer supports on the Bravo <br /> Box to position, level and center the box in the island form, <br /> according to your specs. <br /> .3. Secure the box so it cannot shift during the concrete pour. <br /> Cement the anchor bolt to the island using the anchor bolt <br /> positions. <br /> 4. Properly protect the anchor nut threads during the island pour. <br /> IMPORTANT: To allow access to the plumbing and electrical a <br /> connections,DO NOT pour the slab or driveway. qConAeclo, 4.916 <br /> S. After concrete dries, remove backfill from one sideof the <br /> island, leaving access to the plumbing and electrical connec- netions.6. PRIMARY LINE: Connect a UL approved flex connector and nor <br /> coupling to the bottom of the product line,using a proper seal- 3•e <br /> ing compound. (Rigid fittings can be used for primary and sec- <br /> ondary line connections,if desired.)(See 3-B). <br /> 7. SECONDARY CONTAINMENT: Install flexible hose over the <br /> primary flex line and use recommended fasteners. Secure it to <br /> the B-18 fitting and to the primary or secondary pipe.(sel <br /> IMPORTANT: For rigid piping, apply a UL approved pipe <br /> sealant to the male threaded end.Hold the B-18 fitting stationary <br /> while securing the threaded pipe end to the bottom of the fitting. <br /> e Secondary containment piping can be terminated by 3"hose or <br /> by 3"rigid piping, a, o <br /> e The Bravo B-183 telescopic fitting (standard)has a 3" adapter seaooll second <br /> In „ <br /> eonoinmm Con4mmani <br /> for a 3"hose. ".11041 most 11"70 hNd <br /> •e Bravo's B-18.4 telescopic fitting can be used with a 3" rigid <br /> female NPT or a 4"hose(O.D.). 3-C <br /> continue to pose S <br /> 3 <br /> JUN-17-1998 16:06 12666229629 96% P.06 <br />
The URL can be used to link to this page
Your browser does not support the video tag.