Laserfiche WebLink
Site Safety and Health Plan <br /> UST Removal Project <br /> ABF Freight System,Inc. <br /> • Manteca,California Page 7 <br /> 6. Backfill and Compact; <br /> 7. Site Restoration. <br /> Are any off-site tasks planned? NO <br /> 3.3 Utility Clearance <br /> • To be performed by: Underground Service Alert <br /> • Date to be performed: Prior to work <br /> • Utility clearance methods proposed: na <br /> • The Utilities Clearance Checklist Form (Attachment 3) must be completed and returned to <br /> the Project Manager for review and signature, with copies forwarded to the Health and Safety <br /> Manager and project file. <br /> 4.0 TASK-SPECIFIC SAFETY AND HEALTH RISK ANALYSIS <br /> 4.1 Hazard Analysis <br /> A project specific hazard analysis has been developed and is presented in Attachment 4. The <br /> hazard analyses provides principal steps for each "feature of work" identified for the project. In <br /> general, the following features of work have been identified with respect to site tasks and <br /> operations: <br /> 1. Removal of residual Product; <br /> 2. Tank and Soil Excavation; <br /> 3. Soil Sampling; <br /> 4. Stockpiling of Soil; <br /> 5. Transport and Disposal of Tanks and Soil; <br /> 6. Backfill and Compact; <br /> • The hazard analysis presented in Attachment 4 provides a step by step procedural design for each <br /> \\SERVERI\C-DR1VE\PRO]ECTS\3272\Plans and Reports\Site Safety Health Plan.doc February 10,1999 <br />